Suggested Searches

Artemis

    NASA to Explore Additional Methods to Send VIPER to Moon

    Following an evaluation of partnership proposals to land a water-seeking robot on the lunar surface, NASA is instead opting to explore alternative approaches to deliver its VIPER (Volatiles Investigating Polar Explorer Rover) rover to the Moon. NASA announced Wednesday it is canceling its Lunar Volatiles Science Partnership Announcement for Partnership Proposals solicitation, which sought opportunities...

    Read Full Post

    NASA’s Artemis II Orion Spacecraft Ready for Fueling, Processing

    The Orion spacecraft for NASA’s Artemis II crewed mission around the Moon has been on the move. Technicians relocated the spacecraft May 5 from the Neil A. Armstrong Operations and Checkout Facility at the agency’s Kennedy Space Center in Florida, where it was assembled, to its fueling facility at the spaceport. “With the Artemis II mission...

    Read Full Post

    Rocket Upper Stage Integrated as Preparations for Artemis II Continue

    Engineers at NASA’s Kennedy Space Center in Florida successfully integrated the SLS (Space Launch System) rocket’s upper stage May 1, inside the Vehicle Assembly Building, marking another key step toward preparing to launch the agency’s Artemis II crewed test flight around the Moon.    Technicians with NASA’s Exploration Ground Systems Program stacked the upper stage,...

    Read Full Post

    NASA Set to Fly South Korean CubeSat on Artemis II Test Flight

    NASA and the Korea AeroSpace Administration (KASA) signed an agreement May 2 for KASA to fly a CubeSat on NASA’s Artemis II test flight next year. K-Rad Cube will use a dosimeter made of material designed to mimic human tissue to measure space radiation and assess biological effects at various altitudes across the Van Allen...

    Read Full Post

    NASA’s Mobile Launcher 2 Continues to Grow

    Image of NASA's Vehicle Assembly Building and mobile launcher 2 under construction

    The tower of NASA’s mobile launcher 2 continues to rise with the addition of two new 40-foot-tall modules on April 22 at NASA’s Kennedy Space Center in Florida. The mobile launcher 2 team, led by Bechtel National Inc., has integrated modules 6 and 7, which are the third and fourth of seven sections that will...

    Read Full Post

    NASA’s Moon Seismometer Cleared for Construction 

    Three people in white astronaut suits with helmets and orange gloves stand in an area of sand-like substance, holding science instruments. One instrument in buried slightly in the sand

    NASA has confirmed that a seismometer being designed for the lunar surface is ready for building and assembly. The Lunar Environment Monitoring Station (LEMS) is one of several science payloads in development for potential deployment by astronauts during NASA’s Artemis III mission.   The LEMS instrument is a compact suite of seismometers, about the size...

    Read Full Post

    NASA Artemis II Moon Rocket Gets New Addition

    NASA’s Artemis II Moon rocket is taking shape following the successful integration of the launch vehicle stage adapter onto the SLS (Space Launch System) core stage on April 12 inside the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida. Technicians with NASA’s Exploration Ground Systems Program used a 325-ton crane to hoist...

    Read Full Post

    NASA’s Artemis II Core Stage Integration Complete at Kennedy

    Image shows orange rocket stage with two large solid rocket boosters stacked alongside on March 23.

    Another element of the SLS (Space Launch System) rocket for Artemis II is poised for flight. Technicians joined the core stage March 23 with the stacked solid rocket boosters for the mission at NASA’s Kennedy Space Center in Florida. Teams with NASA’s Exploration Ground Systems Program and primary contractor Amentum used one of the five...

    Read Full Post

    NASA Science Data Received, Blue Ghost Captures Eclipse From Moon

    View of Earth blocking the light of the sun, creating a bright ring of light in the lunar sky captured by Firefly's Blue Ghost Mission 1 lunar lander from its landing site on the Moon.

    Following a successful landing on March 2, Firefly Aerospace’s Blue Ghost Mission 1 has been operating on the lunar surface for nearly two weeks. As part of the agency’s Commercial Lunar Payload Services (CLPS) initiative, Firefly’s Blue Ghost lunar lander delivered 10 NASA science and technology instruments to the Mare Crisium basin on the near...

    Read Full Post

    NASA Artemis II Core Stage Goes Horizontal Ahead of Final Integration

    Technicians from NASA’s Exploration Ground Systems use massive cranes inside the agency’s Vehicle Assembly Building (VAB) to lift the fully assembled SLS (Space Launch System) core stage vertically 225 feet above the ground from High Bay 2 to a horizontal position in the facility’s transfer aisle at NASA’s Kennedy Space Center in Florida on Friday, March 14, 2025. The 212-foot core stage will undergo final checkouts before being lifted into the VAB’s High Bay 3 for integration alongside the completed stack of twin solid rocket booster segments.

    Technicians used massive cranes inside NASA’s Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida to lift the SLS (Space Launch System) core stage out of High Bay 2 and into a horizontal position in the facility’s transfer aisle. The move, completed on March 14, prepares the stage for integration with other...

    Read Full Post