Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 04/25/13

    New Status: 51 Progress (51P) Docking Status: Following yesterday’s launch, the Progress 51P Kurs-A antenna АСФ2 failed to deploy nominally.  All attempts by MCC-M to deploy the antenna have been unsuccessful.  MCC-M is working a plan to dock Progress to the SM AFT docking port with the antenna in the stowed configuration, which will be reviewed …

    Read Full Post

    ISS Daily Summary Report – 04/24/13

    New Status: 51 Progress (51P) Launch: 51P launched at 5:12 am CDT. Ascent was nominal and the vehicle reached orbital insertion at 5:21 am CDT. All appendages except Kurs-A antenna АСФ2 were deployed.  Telemetry shows the АСФ2 antenna remains in its fully stowed position. The Russians are troubleshooting in the hopes of deploying the antenna. A …

    Read Full Post

    ISS Daily Summary Report – 04/23/13

    New Status: Columbus Water On Off Valve 7 (WOOV7) Remove and Replace (R&R): During a WOOV8 R&R on January 18, 2013, the crew observed that WOOV7 was notably contaminated from condensation deposits. This morning Commander (CDR) Hadfield pre-gathered required tools and with assistance from Flight Engineer (FE)-6 Marshburn, removed and replaced the contaminated unit with a …

    Read Full Post

    ISS Daily Summary Report – 04/22/13

    New Status: Columbus Water On Off Valve 7 (WOOV7) Remove and Replace (R&R) Preparation: Commander (CDR) Hadfield pre-gathered hardware in preparation for the WOOV7 R&R scheduled for tomorrow. Multi-user Droplet Combustion Apparatus (MDCA) Hardware Replacement: Cassidy reviewed procedures, gathered hardware, accessed the Combustion Integration Rack (CIR) Combustion Chamber and removed the MDCA Chamber Insert Assembly (CIA). He …

    Read Full Post

    ISS Daily Summary Report – 04/19/13

    New Status: Russian Segment (RS) Extravehicular Activity (EVA) #32: Flight Engineer (FE)-1 Vinogradov and FE-4 Romanenko performed a 6 hour 38 minute EVA. Egress was at 9:03 am. All planned tasks were completed nominally, including installation of the Obstanovka experiment, and the removal and replacement of the Laser Radar Reflector (LRR).  The LRR is used as …

    Read Full Post

    ISS Daily Summary – 04/18/13

    New Status: Ku-Comm Unit #1 High-Rate Communications System (HRCS) COAX Connections: Commander (CDR) Hadfield and Flight Engineer (FE)-6 Marshburn connected Ku Comm Unit 1 to the Space to Ground Transmitter Receiver Controller (SGTRC) final configuration.  The Ground activated Ku-Comm Unit 1 and confirmed video, payload data and Orbiter Communication Adapter (OCA) were functioning nominally. This completes …

    Read Full Post

    ISS Daily Summary Report – 04/17/13

    New Status: Blood Pressure (BP) Regulation (Reg) Experiment: Hadfield set up the Human Research Facility (HRF) PFS (Pulmonary Function System) and the European Physiology Module (EPM) Cardiolab (CDL) Leg/Arm Cuff System (LACS) and conducted the first ever session of this experiment. Marshburn is scheduled to conduct the experiment Friday. The test will help to identify the …

    Read Full Post

    ISS Daily Summary Report – 04/16/13

    New Status: Mobile Servicing System (MSS) Operations: Last night Robotics Ground Controllers powered up MSS and maneuvered the Space Station Remote Manipulator System (SSRMS) into position to support a video survey of Pressurized Mating Adapter (PMA)2. They used the SSRMS Tip Elbow Camera Light Pan/Tilt Assembly (CLPA) to perform the survey then maneuvered the SSRMS back …

    Read Full Post

    ISS Daily Summay Report – 04/15/13

    New Status: 49 Progress (49P) Undock: 49P undocked nominally from the ISS Service Module (SM) aft port at 7:02 am CDT. 49P performed a nominal 15-sec (∆V ≈ 0.67 m/s) automated separation burn at 7:05 am CDT, followed by a nominal 10.695 m/s retrograde phasing burn at 10:15 am CDT.  49P will perform free flight burns …

    Read Full Post

    ISS Daily Summary Report – 04/12/13

    New Status: ENERGY Experiment: Hadfield completed Day 4 of his 10-day ENERGY experiment session. The experiment includes eating a standardized meal, diet logging, specific water intake, measurements of Oxygen uptake, collection of urine samples, and wearing an armband activity monitor. A loss in astronauts’ body mass is a systematic observation during space flight. The aim of …

    Read Full Post

Subscribe to this blog

Show Past Archives