Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from January 2018

View All Posts

    ISS Daily Summary Report – 1/31/2018

    Synchronized Position Hold, Engage, Reorient, Experimental Satellites (SPHERES) SmoothNav: The crew set up the SPHERES work area to activate and check out the hardware and EXPRESS laptop computer (ELC) before conducting the SmoothNav experiment run. SmoothNav develops an estimation algorithm aggregating relative state measurements between multiple, small, and potentially differently instrumented spacecraft. The algorithm obtains …

    Read Full Post

    ISS Daily Summary Report – 1/30/2018

    Personal CO2 Monitor Sensor Calibration: Today the crew will perform a single point calibration of the Personal CO2 monitors using and iPad and readings from a Major Constituent Analyzer (MCA) sample port. The Personal CO2 Monitor demonstrates a system capable of unobtrusively collecting and downlinking individual crew members’ CO2 exposure for weeks to months. This …

    Read Full Post

    ISS Daily Summary Report – 1/29/2018

    USOS ExtraVehicular Activity (EVA) 48 status:  Over the weekend, ground teams were able to identify a root cause and a fix for the Space Station Remote Manipulator System (SSRMS) Latching End Effector (LEE) anomaly seen after USOS EVA 47.  Because of this, the EVA to return the LEE to the configuration prior to EVA 47 …

    Read Full Post

    ISS Daily Summary Report – 1/26/2018

    European Modular Cultivation System (EMCS) Preparation for Plant Gravity Perception Operations: To prepare the EMCS for the Plant Gravity Perception investigation, the crew replaced the empty EMCS Air Mix Supply Module located on the lower left side of the EMCS holding structure with a full Air Mix Module and then opened the EMCS Gas Valves …

    Read Full Post

    ISS Daily Summary Report – 1/25/2018

    FemtoSat Assembly and Deployment: Using onboard components printed from the Additive Manufacturing Facility (AMF)-Manufacturing Device, today the crew demonstrated FemtoSat deployment trajectories. This experiment consists of a 3D printed deployer, four FemtoSats and a 0.050” L-wrench. The four FemtoSats will be loaded in the deployer and locked in place with the L-wrench.  When the L-wrench …

    Read Full Post

    ISS Daily Summary Report – 1/24/2018

    Arthrospira-B (Batch Culture): Today concluded the incubation of three Arthrospira-B experiment containers (ECs), one that began two weeks ago, and two that began last week. The ECs were removed from the BioLab Incubator and disassembled inside of the BioLab Glovebox, prior to the samples being inserted into the Minus Eighty Degree Celsius Laboratory Freezer for ISS …

    Read Full Post

    ISS Daily Summary Report – 1/23/2018

    USOS Extra Vehicular Activity (EVA) #47:  Today, Mark Vande Hei (as EV1) and Scott Tingle (as EV2) successfully completed USOS EVA #47 with a Phased Elapsed Time (PET) of 7 hrs 24 min. The primary goal of the EVA was to swap the Latching End Effector (LEE) from the Space Station Remote Manipulator System (SSRMS) …

    Read Full Post

    ISS Daily Summary Report – 1/22/2018

    Light Microscopy Module (LMM) Petri Plants Plate Operations: Over the weekend, the crew used the light meter in the Japanese Experiment Module (JEM) to take light intensity measurements before transporting the plates to the Lab to photograph the plates with and without lids.  Plants cultivated in microgravity look mostly normal, but space-grown plants have a …

    Read Full Post

    ISS Daily Summary Report – 1/19/2018

    Vascular Echo: After completing the Cardiolab (CDL) blood pressure measurement earlier this week, today the 53S subject performed the Vascular Echo Exercise Portable Doppler (PDOP) measurement with ground team assistance. Using the CDL PDOP, the crewmember donned the PDOP femoral probe and performed a 1-minute exercise followed by a resting period during which data was …

    Read Full Post

    ISS Daily Summary Report – 1/18/2018

    Plant Habitat Gaseous Nitrogen (GN2) Hose Connection: Today the crew removed and replaced the acoustic blanket and growth chamber door before retrieving the GN2 filter and connecting it to the EXpedite the PRocessing of Experiments to Space Station (EXPRESS) Rack nitrogen. The other end was connected to the GN2 hose in order to perform a …

    Read Full Post