Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from May 2018

View All Posts

    ISS Daily Summary Report – 5/31/2018

    EXPRESS Rack-3 Improved Payload Ethernet Hub Gateway (iPEHG) and Veggie:  The crew rotated EXPRESS Rack 3 down in the Columbus module today, installed an iPEHG and then rotated the rack back up.  They then reinstalled the Veggie facilities into the rack and checked them out.  Ground teams have activated EXPRESS Rack 3 and the iPEHG …

    Read Full Post

    ISS Daily Summary Report – 5/30/2018

    Solidification Using Baffles in Sealed Ampoules (SUBSA):  Today the crew deactivated SUBSA, exchanged sample ampoules, and started SUBSA processing of the new sample.  The objective of the SUBSA investigation is to advance understanding of the processes involved in semiconductor crystal growth. It offers a gradient freeze furnace for materials science investigations that can reach 850°C. …

    Read Full Post

    ISS Daily Summary Report – 5/29/2018

    Solidification Using Baffles in Sealed Ampoules (SUBSA):  The crew set up the SUBSA hardware today and installed a calibration sample.  The objective of the SUBSA investigation is to advance understanding of the processes involved in semiconductor crystal growth. It offers a gradient freeze furnace for materials science investigations that can reach 850°C. Samples are contained …

    Read Full Post

    ISS Daily Summary Report – 5/28/2018

    Kubik 6:  After completing commissioning for ESA’s Kubik 6 facility the crew disconnected and stowed the Kubik 6.  Kubik is a small controlled-temperature incubator/cooler used to study biological samples in a microgravity environment.  It is equipped with removable inserts designed for self-contained, automatic experiments using seeds, cells, and small animals. Electro-static Levitation Furnace (ELF):  The …

    Read Full Post

    ISS Daily Summary Report – 5/25/2018

    NanoRacks-Remove Debris (RemDeb):  The crew pressurized and performed a leak check of the Japanese Experiment Module Airlock (JEMAL) and then extended the Airlock slide table into the JEM this morning. They then removed the Handhold Experiment Platform (HXP) Adapter and the Multipurpose Experiment Platform (MPEP) from the Slide Table.  These activities are the initial preparation …

    Read Full Post

    ISS Daily Summary Report – 5/24/2018

    Orbital ATK (OA)-9 Cygnus S.S. J.R. Thomson Rendezvous with ISS:  The crew successfully captured the S.S. J.R. Thompson with the Space Station Remote Manipulation System (SSRMS) at 4:29 am CDT. Once captured, the crew handed off control of the SSRMS to ground robotics controllers who maneuvered the Cygnus vehicle to the Node 1 nadir Common …

    Read Full Post

    ISS Daily Summary Report – 5/23/2018

    Human Research Program (Biochemical Profile, Marrow, Vascular Echo, and Repository):  53S crewmembers collected blood and urine samples for their Return minus 14-day session of the Biochem Profile, Marrow and Repository investigations.  One of the 53S crewmembers also started a 24-hour ambulatory blood pressure monitoring session.  Blood samples are being processed in the alternate non-refrigerated centrifuge …

    Read Full Post

    ISS Daily Summary Report – 5/22/2018

    Advanced Combustion via Microgravity Experiments (ACME):  The crew replaced the Combustion Integrated Rack (CIR) manifold bottles this morning. To prepare for the second part of the CLD Flames investigation the crew configured the ACME Chamber Insert, replaced the igniter tip, and replaced two ACME controllers.  The ACME experiment series being performed in the CIR includes …

    Read Full Post

    ISS Daily Summary Report – 5/21/2018

    Orbital-ATK 9 (OA-9) Launch: OA-9 launched from the Wallops Flight Facility this morning at 08:44:06 GMT (3:44 CT).  The Cygnus solar arrays have been deployed nominally.  OA-9 capture and berthing to the ISS is planned for Thursday 24-May. Atomization:  This morning a crewmember set up and activated the Atomization hardware in the Multi-purpose Small Payload …

    Read Full Post

    ISS Daily Summary Report – 5/18/2018

    Orbital-ATK 9 (OA-9) Launch: OA-9 launch from the Wallops Flight Facility is set for Monday 21-May at 08:39 GMT (3:39 CT).  OA-9 capture and berthing to the ISS continues to be planned Thursday 24-May. Exposed Experiment Handrail Attachment Mechanism (ExHAM) #2:  Today the crew attached new samples to the ExHAM#2, which is attached to the …

    Read Full Post