ISS On-Orbit Status Report

Viewing Posts from November 2016

View All Posts

    ISS Daily Summary Report – 11/30/2016

    Robotic External Leak Locator (RELL) Operations: Yesterday, Ground Controllers used the SPDM to remove the RELL from the JEMAL Slide Table. A checkout was performed by pointing RELL towards deep space in order to scan a clean environment as a baseline. Today, RELL performed background scans along the Port 1 (P1) truss segment in order …

    Read Full Post

    ISS Daily Summary Report – 11/29/2016

    Robotic External Leak Locator (RELL) Operations: On GMT 333, upon powering up the Space Station Remote Manipulator System (SSRMS) Special Purpose Dexterous Manipulator (SPDM) for RELL ops, the Dexterous Manipulator Control Software (DMCS) Payload Status showed “Unloaded” for ORU Tool Changeout Mechanism (OTCM) 2 instead of “Secure” which was unexpected since it was captured to …

    Read Full Post

    ISS Daily Summary Report – 11/28/2016

    Device for the study of Critical Liquids and Crystallization High Temperature Insert-Reflight (DECLIC-HTI-R) Installation: Today the crew installed and connected the Electronics Locker and Experiment locker cables for the DECLIC facility, before installing the HTI-R experiment insert. During operations, 400 milliliters of water leaked during the quick disconnect connection, but connecting the cables in reverse …

    Read Full Post

    ISS Daily Summary Report – 11/25/2016

    FLame EXtinguishment (FLEX)-2 Multi-user Droplet Combustion Apparatus (MDCA) Exchange: This morning, the crew was scheduled to perform a Fluids and Combustion Facility (FCF) MDCA replacement in preparation for the FLEX-2 experiment.  The Crew was unable to remove the MDCA Chamber Insert Assembly (CIA) from the Combustion Integration Rack (CIR) Combustion Chamber.  Ground teams will meet …

    Read Full Post

    ISS Daily Summary Report – 11/24/2016

    Cell Biology Experiment Facility (CBEF) Centrifuge Remove and Replace (R&R): The crew was scheduled to remove the 1G centrifuge from the CBEF and install a new centrifuge.  However, the bag with the new centrifuge could not be found.  Teams are investigating impacts to downstream science and opportunities to launch replacement hardware.  The CBEF is a …

    Read Full Post

    ISS Daily Summary Report – 11/23/2016

    Marrow Air Sampling: The crew performed their first Marrow air sampling collection today.  A breath sample and ambient air sample were collected and stowed for return on a later flight. The Marrow investigation looks at the effect of microgravity on the bone marrow. It is believed that microgravity, like long-duration bed rest on Earth, has …

    Read Full Post

    ISS Daily Summary Report – 11/22/2016

    Waste and Hygiene Compartment (WHC) Maintenance:  Ground specialists met to discuss the WHC leak that occurred yesterday.  Based on review of the imagery the crew took during the cleanup, the ground specialists determined the most likely source of the leak to be a hydroconnector on the Urine Valve Block, but determined that since all of …

    Read Full Post

    ISS Daily Summary Report – 11/21/2016

    Urine Processing Assembly (UPA) Potential Wastewater Storage Tank Assembly (WSTA) Leak: This morning an unexpected caution indicating “UPA Potential WSTA leak” annunciated following use of the Waste and Hygiene Compartment (WHC). The crew isolated the UPA and WHC was configured to internal [EDV] to isolate the system. An on-orbit inspection by the crew showed pretreated …

    Read Full Post

    ISS Daily Summary Report – 11/18/2016

    Preparation for Cygnus Unberth and Release: The crew completed configuring the Cygnus and the Node 1 vestibule in preparation for Cygnus departure on Monday, November 21st. Today’s task included removing Intermodule Ventilation and Power/Data Jumpers, installing the Common Berthing Mechanism (CBM) Center Disk Cover and four CBM Controller Panel Assemblies (CPAs) onto an Active CBM …

    Read Full Post

    ISS Daily Summary Report – 11/17/2016

    49 Soyuz (49S) Launch: 49S launched successfully from the Baikonur Cosmodrome at 2:20 pm CST this afternoon, with Peggy Whitson, Thomas Pesquet, and Oleg Novitskiy. Docking is scheduled for Saturday, November 19th at 4:01 pm CST. Once docked, the ISS crew complement will increase from 3 to 6 crewmembers.  Human Research Facility (HRF) Software Upgrades: …

    Read Full Post