Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew completed various activities to assist the ISS crew in restoring payload capabilities. The crew completed an activity to replace the Combustion Integrated Rack (CIR) Manifold-1 Bottle and an activity to perform a CO2 Sensor Remove & Replace (R&R) in the Plant Habitat facility. Payloads: CIR/Solid …
ISS Daily Summary Report – 6/27/2024
Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew spent time rebuilding the Pressure Control and Pump Assembly (PCPA) SN007 as practice before rebuilding the PCPA SN002 as a viable spare PCPA for the Urine Processor Assembly (UPA). Payloads: ExPRESS Rack-6 Laptop (ELC-6): The hard drive was swapped on ELC-6 as part of laptop …
ISS Daily Summary Report – 6/26/2024
Boeing CST-100 Crewed Flight Test (CFT): The CFT crew performed various maintenance and cargo activities to assist the ISS crew. They completed an activity to help organize the PMM and an activity to remove the Urine Processor Assembly (UPA) Pressure Control and Pump Assembly (PCPA) Motor from PCPA SN002 in support of the PCPA Motor …
ISS Daily Summary Report – 6/25/2024
Boeing CST-100 Crewed Flight Test (CFT): The CFT crew performed a variety of systems activities to assist the ISS crew. The crew completed Urine Processor Assembly (UPA) Troubleshooting, Extravehicular Activity (EVA) Airlock Deconfiguring, and an activity to remove the UPA Pressure Control and Pump Assembly (PCPA) Motor from PCPA SN007 in support of the PCPA …
ISS Daily Summary Report – 6/24/2024
USOS Extravehicular Activity (EVA) #90 Radio Frequency Group (RFG) Retrieval Part 2.5:Today’s RFG Retrieval 2.5 EVA was terminated shortly following Airlock Hatch opening and prior to crew egress due to an Airlock SCU water leak. The Airlock was safely repressed and the EV crew doffed their suits. The Expedition 71 EVA series is being reevaluated …
ISS Daily Summary Report – 6/21/2024
Boeing CST-100 Crewed Flight Test (CFT): The crew performed CFT Departure Preparation and crew conferences with the ground team to prepare for CFT undock. Systems: Space Station Remote Manipulator System (SSRMS) Latching End Effector A (LEE A) Survey:The ground team is in the process of completing a survey of LEE A using remote commanding. The …
ISS Daily Summary Report – 6/20/2024
Boeing CST-100 Crewed Flight Test (CFT): The CFT crew completed a variety of systems activities to assist the ISS crew. They completed a PMM Endcone scavenge activity, a Chotherm Remove and Replace (R&R), a Crew Provisions Refresh, Waste and Hygiene Compartment (WHC) Wring Collector (COT) R&R, and CST-100 Stowage Audit and Seat Adjustments. Payloads: Astrobee: The …
ISS Daily Summary Report – 6/19/2024
Boeing CST-100 Crewed Flight Test (CFT): The CFT crew completed a variety of systems activities to assist the ISS crew. They completed a Contingency Water Container – Iodine (CWC-I) reorganization, Carbon Dioxide Removal Assembly (CDRA) Cleaning, Cygnus Trash Gather, and a Life Science Glovebox (LSG) Sleeve Check. Payloads: Genes in Space Molecular Operations and Sequencing …
ISS Daily Summary Report – 6/18/2024
Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew completed a variety of activities to assist the ISS crew and further operations on-orbit. They completed Gaucho Lung operations, Columbus Smoke Detector Cleanings, Genes in Space Molecular Operations and Sequencing (GiSMOS) operations, an International Docking Adapter (IDA) Multi-Layer Insulation (MLI) Reseat, and Crew Departure Preparations. …
ISS Daily Summary Report – 6/17/2024
ISS Reboost: Friday, the ISS performed a reboost using the SM Aft 87P R&D thrusters at 11:40 PM CDT. This is one in a series of reboosts to set up proper phasing conditions for Progress 89P launch in August. The burn duration was 23 minutes 25 seconds with a delta-V of 2.0 m/s. Boeing CST-100 …