Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

ISS Daily Summary Report – 6/21/2024

Boeing CST-100 Crewed Flight Test (CFT): The crew performed CFT Departure Preparation and crew conferences with the ground team to prepare for CFT undock.

Systems:

Space Station Remote Manipulator System (SSRMS) Latching End Effector A (LEE A) Survey:The ground team is in the process of completing a survey of LEE A using remote commanding. The SSRMS is being used to position LEE A in front of the External High-Definition Camera (EHDC) and the LEE A snares are partially closed to prepare for the survey. All data will be downlinked to the ground for review.

Waste and Hygiene Compartment (WHC) Manual Fill Initiation and Termination: Today, the crew initiated a manual fill of the WHC EДВ-СВ (Water Container) using a Post-Flight Analysis Bag to capture any pressure relief to protect the dose pump. The fill was then terminated, and the Post-Flight Analysis Bag was analyzed after the pressure relief burp. The ЕДВ-CB is intended for short-term storage and manual water transportation between facilities. After successfully filling the EДВ-СВ, the crew returned the WHC to nominal use.

Look Ahead Plan

Saturday, June 22 (GMT 174)
Payloads:

  • Telescience Resource Kit (TREK) Node 2 Setup

Systems:

  • Crew Off Duty

Sunday, June 23 (GMT 175)
Payloads:

  • No Payloads Activities

Systems:

  • Extravehicular Activity (EVA) Equipment Lock (E-LK) Preparation
  • EVA Tool Audit
  • EVA Procedure Review & Conference
  • EVA ROBoT Review & Conference
  • Emergency Equipment Gather & Transfer
  • CFT Cargo Operations
  • CFT Emergency Battery Checkout
  • Urine Transfer System (UTS) Recycle Tank Drain

Monday, June 24 (GMT 176)
Payloads:

  • ISS External Microorganisms (IEM) Sample Adjust and Cold Stowage Insert

Systems:

  • USOS EVA #90 – RFG Retrieval Part 2.5 EVA
  • CFT Departure Procedure Review & Conference