AMS-02 (Alpha Magnetic Spectrometer) EVA preparation: The crew continued preparation for the AMS repair EVAs with procedure reviews. The multiple AMS-02 repair EVAs are being performed to recover a series of cooling pumps within the AMS-02 experiment. The first of the EVAs are currently planned to start in roughly 2 weeks. AMS-02 is a state-of-the-art …
ISS Daily Summary Report – 10/30/2019
AMS-02 (Alpha Magnetic Spectrometer) Extravehicular Activity (EVA) Preparation: The crew continued preparation for the AMS repair Extravehicular Activities (EVAs) with procedure reviews and other activities. Multiple AMS-02 repair EVAs are being planned, to recover a series of cooling pumps within the AMS-02 experiment. The first of the EVAs are currently planned to start in 2 …
ISS Daily Summary Report – 10/29/2019
Astrobee: The crew reviewed the Astrobee OBT (On-board Training) in preparation for tomorrow’s hardware checkout and calibration session. Astrobee is a series of three free-flying, cube-shaped robots. The robots are designed to help scientists and engineers develop and test technologies for use in microgravity to assist astronauts with routine chores, and give ground controllers additional …
ISS Daily Summary Report – 10/28/2019
EML: In support of the currently on-going batch 2.4, the crew closed the Argon valve system, opened the Helium valve system and switched the camera mode to RECAL. The EML (Electro-Magnetic Levitator) is a 360 kg multi-user facility designed for containerless materials processing in space. It supports research in the areas of meta-stable states and …
ISS Daily Summary Report – 10/25/2019
ACE-T6 (Advanced Colloids Experiment): The crew reconfigured the LMM (Light Microscopy Module) for the next ACE (Advanced Colloids Experiment) science runs. Colloids are suspensions of microscopic particles in a liquid, and they are found in products ranging from milk to fabric softener. Consumer products often use colloidal gels to distribute specialized ingredients, for instance droplets …
ISS Daily Summary Report – 10/24/2019
BEST (Biomolecule Extraction and Sequencing Technology): The crew performed BEST experiment operations part 2 involving the transfer of cells from the Media Kit to the new Media Tubes using pipettes and then temp stowed for the next 5-10 days. The BEST investigation studies the use of sequencing for identification of unknown microbial organisms living on …
ISS Daily Summary Report – 10/23/2019
CBEF-L (Cell Biology Experiment Facility-L): The crew continued to trouble shoot the equipment installation. Cell Biology Experiment Facility-L (CBEF-L) is a Japan Aerospace Exploration Agency (JAXA) new subrack facility, which is an upgraded facility of the original Cell Biology Experiment Facility (CBEF) currently aboard the International Space Station (ISS). CBEF-L provides new capabilities with additional …
ISS Daily Summary Report – 10/22/2019
The ISS Experience: The crew recorded Astronaut logs for the ISS Experience study. The ISS Experience creates a virtual reality film documenting daily life aboard the ISS. The 8 to 10 minute videos created from footage taken during the six-month investigation cover different aspects of crew life, execution of science aboard the station, and the …
ISS Daily Summary Report – 10/21/2019
Veg-04B: The crew performed a routine plant check. This includes the assessment of individual plant pillows, the addition of water as necessary, and photography of the Mizuna plants. The Pick-and-Eat Salad-Crop Productivity, Nutritional Value, and Acceptability to Supplement the ISS Food System (Veg-0404A, Veg-04B, and Veg-05) investigation is a phased research project to address the …
ISS Daily Summary Report – 10/18/2019
Veg-04B: The crew performed a routine plant check. This includes the assessment of individual plant pillows, the addition of water as necessary, and photography of the Mizuna plants. With earlier versions of the Veggie experiments, the root mat is typically filled when the experiment is initiated. The research of Veg-04B focuses on the impact of …


