Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from November 2018

View All Posts

    ISS Daily Summary Report – 11/30/2018

    Cemsica sample exchange: Today the crew removed the processed first Cemsica science cartridge from the SUBSA facility and inserted the second science cartridge.  Cemsica tests a novel approach of using particles of calcium-silicate (C-S) to synthesize nanoporous membranes (those with pores 100 nanometers or smaller) that can separate carbon dioxide molecules from air or other …

    Read Full Post

    ISS Daily Summary Report – 11/29/2018

    JEM Airlock (JEMAL) Depressurization: The JEM Airlock was depressurized in preparation for the transfer of the NanoRacks External Platform Inserts (NREP) back to the Exposed Facility Unit (EFU) 4 location. The NREP was brought inside ISS earlier this week so the crew could exchange the sortie 3 payload for the sortie 4 payload. Each NREP …

    Read Full Post

    ISS Daily Summary Report – 11/28/2018

    Cemsica Sample Exchange:  Today the crew removed the calibration cartridge from the SUBSA facility and inserted the first Cemsica science cartridge for processing. Cemsica tests a novel approach of using particles of calcium-silicate (C-S) to synthesize nanoporous membranes (those with pores 100 nanometers or smaller) that can separate carbon dioxide molecules from air or other …

    Read Full Post

    ISS Daily Summary Report – 11/27/2018

    CASIS PCG-16 card fill: The crew continued the PCG Card Micro-G card fill that was not fully completed the previous day. This was performed using some of today’s microscope observation time due to the relatively short lifetime of the protein precipitant solution. Crystallization of LRRK2 Under Microgravity Conditions-2 (CASIS PCG 16) evaluates growth of Leucine-rich …

    Read Full Post

    ISS Daily Summary Report – 11/26/2018

    At Home in Space (AHIS):  The crew completed an AHIS questionnaire this morning.  This Canadian Space Agency investigation assesses culture, values, and psychosocial adaptation of astronauts to a space environment shared by multinational crews on long-duration missions. It is hypothesized that astronauts develop a shared space culture that is an adaptive strategy for handling cultural …

    Read Full Post

    ISS Daily Summary Report – 11/23/2018

    Food Acceptability Questionnaire: The crew performed the Food Acceptability questionnaire. Food Acceptability seeks to determine the impact of repetitive consumption of food currently available from the spaceflight food system.  The results will be used in developing strategies to improve food system composition to support crew health and performance on long duration missions. Microgravity Investigation of …

    Read Full Post

    ISS Daily Summary Report – 11/21/2018

    Loop Heat Pipe Radiator (LHPR) removal: Following a successful completion of the LHPR experiment on GMT 320, today the crew removed it from the MPEP and stowed the hardware.  The Multi-Purpose Experiment Platform (MPEP) was then removed from the Japanese Experiment Module Air Lock (JEMAL) slide table and troubleshooting was performed on a limit switch …

    Read Full Post

    ISS Daily Summary Report – 11/20/2018

    ISS 20th Anniversary:  The largest and most complex international construction project in space began in Kazakhstan 20 years ago today. Atop its Proton rocket, on November. 20, 1998, the Zarya Functional Cargo Block (FGB) lifted off its launch pad at the Baikonur Cosmodrome. The launch of the first element of the ISS kicked off an …

    Read Full Post

    ISS Daily Summary Report – 11/19/2018

    Northrop Grumman 10 (NG-10):  NG-10 Antares 230 Rocket successfully launched on Saturday, November 17 at 3:01AM CT from NASA’s Wallops Flight Facility in Virginia.  Once in orbit, Cygnus S.S. John Young performed a series of phasing burns over the course of two days to rendezvous with ISS. The crew successfully captured Cygnus with the Space …

    Read Full Post

    ISS Daily Summary Report – 11/16/2018

    Progress (71P) Launch:  71P successfully launched from the Baikonur Cosmodrome today at 12:14PM CT.  71P will be performing a 34 orbit rendezvous with ISS, which sets the stage for docking on Sunday at 1:29PM CT.   Life Sciences Glovebox (LSG) Integration:  The crew performed tasks to install work volume filters, deploy the LSG Laptop, and made …

    Read Full Post