Suggested Searches

Artemis

    NASA, Intuitive Machines, SpaceX Targeting IM-2 Launch Tonight

    A SpaceX Falcon 9 rocket stands vertical on Tuesday, Feb. 25, 2025, at Launch Complex 39A at NASA's Kennedy Space Center ahead of Intuitive Machines' IM-2 mission as part of the agency's Commercial Lunar Payload Services initiative and Artemis campaign.

    NASA science and technology is set to fly aboard Intuitive Machines’ lunar lander as part of the agency’s Commercial Lunar Payload Services (CLPS) initiative and Artemis campaign. SpaceX is targeting no earlier than 7:16 p.m. EST tonight to launch the IM-2 mission from Launch Complex 39A at the agency’s Kennedy Space Center in Florida. Weather...

    Read Full Post

    NASA Readies Orion Spacecraft to Receive Wings

    Technicians have moved NASA’s Artemis II Orion spacecraft out of its assembly stand in preparation for the upcoming installation of its four solar array wings and spacecraft adapter jettison fairings that encapsulate its service module. The move positions NASA another step closer to the first crewed flight test under Artemis. Operators used a 30-ton crane...

    Read Full Post

    Blue Ghost Prepares for Landing, NASA Instrument Breaks Record

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    Firefly’s Blue Ghost Mission 1 is nearly one week away from its Moon landing on Sunday, March 2, after launching on Jan.15. In preparation for landing, Blue Ghost will complete its final lunar orbit maneuver scheduled for Monday, Feb. 24. This maneuver will insert Blue Ghost into a near-circular low lunar orbit, bringing the lander …

    Read Full Post

    Stacking Complete on Artemis II Rocket Boosters

    Engineers with NASA’s Exploration Ground Systems complete stacking operations on the twin SLS (Space Launch System) solid rocket boosters for Artemis II by integrating the nose cones atop the forward assemblies inside the Vehicle Assembly Building’s High Bay 3 at NASA’s Kennedy Space Center in Florida on Wednesday, Feb. 19, 2025. During three months of stacking operations, technicians used a massive overhead crane to lift 10 booster segments – five segments per booster – and aerodynamic nose cones into place on mobile launcher 1. The twin solid boosters will help support the remaining rocket components and the Orion spacecraft during final assembly of the Artemis II Moon rocket and provide more than 75 percent of the total SLS thrust during liftoff from NASA Kennedy’s Launch Pad 39B.

    Engineers at NASA’s Kennedy Space Center in Florida completed stacking the twin SLS (Space Launch System) solid rocket boosters inside the Vehicle Assembly Building for the agency’s Artemis II crewed test flight around the Moon. At launch and during liftoff, the boosters, which each stand 177 feet tall, will provide the majority of the 8.8...

    Read Full Post

    Blue Ghost Remains on Track, Lunar Orbit Insertion Burn Complete

    A bright Moon in the darkness of space with the Moon’s South Pole visible on the far left.

    After about a month in transit to the Moon, Firefly’s Blue Ghost lunar lander successfully completed a four-minute lunar orbit insertion burn Thursday – the longest and most challenging burn conducted to date by the lander’s main engine and reaction control system thrusters. Now that the lander is in lunar trajectory, over the next 16 …

    Read Full Post

    NASA Tech Instrument Captures Test Images During Blue Ghost Lunar Transit

    This image from the short focal length camera, shows a can-like structure which is Blue Ghost’s main engine. The bright objects to the engine’s right and to the left are the lander’s foot pads. The pointed object at the top left is another NASA payload, the Lunar Instrumentation for Subsurface Thermal Exploration with Rapidity (LISTER) instrument, led by Honeybee Robotics, a Blue Origin company, headquartered in Longmont, Colorado. LISTER is designed to measure the heat flow from the interior of the Moon.

    Firefly’s Blue Ghost Mission 1 reached day 15 of its 45-day transit to the Moon. The Stereo Cameras for Lunar Plume-Surface Studies (SCALPSS) 1.1 instrument, designed by researchers at NASA’s Langley Research Center in Hampton, Virginia, to capture images during the spacecraft’s lunar descent and touchdown, successfully received high-resolution test images from all six of …

    Read Full Post

    Firefly Gets First Glimpse of Moon, NASA Instrument Checkouts Continue

    An image from the top deck of Firefly's Blue Ghost lunar lander in the darkness of space with the lit Moon in the distance.

      NASA’s science and technology instruments aboard Firefly’s Blue Ghost Mission 1 are a step closer to the Moon. After almost two weeks in Earth orbit, Firefly announced Thursday that Blue Ghost successfully completed its second engine burn, placing the lander in the correct position to leave Earth’s orbit and continue its journey to the …

    Read Full Post

    Blue Ghost Conducts First Burn, Science Operations, Captures Eclipse

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    Firefly’s Blue Ghost continues its journey to the Moon carrying 10 NASA science and technology instruments. Four days into the mission, the lunar lander completed its first main engine burn. This milestone is the first of several maneuvers that will position the lander in a trajectory towards the Moon. After 25 days orbiting Earth, Blue …

    Read Full Post

Subscribe to this blog