Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 9/10/2021

    Payloads Advanced Plant EXperiment-08 (APEX-08):  The crew harvested plant material that that had been growing in Petri Plates in the Veggie Facilities. The plant material grown in the Petri plates in Veggie for 9 days was harvested and fixed into the KFTs.  The plant material will perfuse in the KFTs for 24 hours and will …

    Read Full Post

    ISS Daily Summary Report – 9/09/2021

    Russian Segment (RS) Extravehicular Activity (EVA) #50: Today, FE-4 Oleg Novitskiy (EV1) and FE-5 Petr Dubrov (EV2) egressed the Mini-Research Module (MRM)-2 airlock and completed the following tasks during today’s 7 hour and 25-minute EVA: Mating of Ethernet cable from ISS USOS to MLM Installation of gap spanner at ПГО-2 along MLM Pl. III Mating …

    Read Full Post

    ISS Daily Summary Report – 9/08/2021

    Payloads Advanced Combustion via Microgravity Experiments (ACME):  A crewmember removed and replaced the ACME Igniter Tip #2.  The ACME project is a set of six independent studies of gaseous flames to be conducted in the Combustion Integrated Rack (CIR).  ACME’s primary and secondary goals are to (1) improve fuel efficiency and reduce pollutant production in …

    Read Full Post

    ISS Daily Summary Report – 9/07/2021

    Payloads: Four Bed CO2 Scrubber:  The crew routed the MSG Aux Power Cable from LAB1O5 UIP to LAB1P4 UIP to provide power to Four Bed CO2 Scrubber.  Four Bed CO2 Scrubber demonstrates a technology for removing carbon dioxide (CO2) from the atmosphere on a spacecraft.  The technology is based on the current system in use …

    Read Full Post

    ISS Daily Summary Report – 9/06/2021

    Payloads Genes in Space-8:  The crew performed the setup of the Fluorescence Viewer and mini-PCR and performed Freeze and Fly Ops #3 to demonstrate the heating and fluorescent visualization functions of the Genes in Space experiment.  Some pharmaceuticals used to maintain astronaut health do not work as well in space, which may be linked to …

    Read Full Post

    ISS Daily Summary Report – 9/03/2021

    Russian Segment (RS) Extravehicular Activity (EVA) #49: Today, FE-4 Oleg Novitskiy (EV1) and FE-5 Petr Dubrov (EV2) egressed the Mini-Research Module (MRM)-2 airlock and completed the following tasks during today’s 7 hour and 54 minute EVA: Retrieve, route, and mate Power Cable Bundles #1 & #2 from MRM2 to MLM (eight Russian Connectors total) Mate …

    Read Full Post

    ISS Daily Summary Report – 9/02/2021

    Payloads Blob: Following the conclusion of the 7-day experiment session, the crew removed the Blob box hardware and transferred the experiment data.  Unfortunately, corrupted data files were found; so, the experiment will be extended to gather more data.  The goal of the Blob investigation is to observe the influence of microgravity on the Blob’s (a …

    Read Full Post

    ISS Daily Summary Report – 9/01/2021

    Payloads APEX-8: The crew gathered the appropriate hardware and installed thirty APEX-08 petri plate plant growth chambers into the Veggie facility.  Compounds known as polyamines contribute to plant stress mitigation on Earth, and plants grown in microgravity display evidence of stress at the morphological level and gene-expression changes suggestive of stress response. Advanced Plant EXperiment-08 …

    Read Full Post

    ISS Daily Summary Report – 8/31/2021

    Payloads: ESA Biofilms: The crew reviewed the big picture words and then installed the Biofilm Experiment Containers (ECs) into the appropriate locations in Kubik 5 and Kubik 6.  The goal of the Biofilm Inhibition On Flight Equipment and On Board the ISS Using Microbiologically Lethal Metal Surfaces (ESA-Biofilms) investigation is to compare how biofilms are …

    Read Full Post

    ISS Daily Summary Report – 8/30/2021

    SpaceX (SpX)-23 Docking:  Following yesterday’s successful launch, Dragon was captured today at 09:31 AM CT and docked successfully to Node 2 Forward at 09:44 AM CT. Prior to docking, the crew gathered and set up necessary tools required for monitoring vehicle approach. After the vehicle docked, the crew completed Dragon International Docking Adapter (IDA) Vestibule …

    Read Full Post

Subscribe to this blog

Show Past Archives