Cygnus NG-16 Departure: On Saturday, November 20th, NG-16 was unberthed from the Node 1 nadir CBM, maneuvered and then released by the Space Station Remote Manipulator System (SSRMS) at 10:01 am CST. Cygnus will deorbit on Wednesday, Dec. 15, following a deorbit engine firing to set up a destructive re-entry. The spacecraft, filled with waste …
ISS Daily Summary Report – 11/19/2021
Payloads: Airborne Particulate Monitor (APM): The crew removed the memory card from the APM, transferred the data, and then reinstalled the card. Air quality in crewed spacecraft is important for keeping astronauts healthy and comfortable. Although requirements exist for maximum allowable concentrations of particulate matter, currently no measurement capability verifies whether these requirements are met. …
ISS Daily Summary Report – 11/18/2021
Payloads: Grip Seated Science 2 Experiment Session: From an upright seated posture, the crew performed experiment tasks looking at friction, discrete movement (with eyes open/closed), and collisions. The Grip experiment studies the long-duration spaceflight effects on the abilities of human subjects to regulate grip force and upper limbs trajectories when manipulating objects during different kind …
ISS Daily Summary Report – 11/17/2021
Radial Hatch Opening: This morning, FE-12 opened all radial hatches in the USOS. This allowed the crew to opportunity to perform several activities, notably EVA preparation activities in the US Airlock. The ISS team continues to monitor the effects of a Russian satellite breakup that created sufficient debris and posed a conjunction threat to the …
ISS Daily Summary Report – 11/16/2021
Orbital Debris Continued Influence: The ISS team continues to monitor the effects of a Russian satellite breakup that created sufficient debris and posed a conjunction threat to the ISS. As part of the nominal procedure for ISS conjunctions, yesterday the crew closed all hatches and both Dragon and Soyuz crews sheltered in their respective vehicles. …
ISS Daily Summary Report – 11/15/2021
Orbital Debris Shelter-In-Place: The ISS team has been notified of a satellite breakup that may create sufficient debris to pose a conjunction threat to the ISS. As part of the nominal procedure for ISS conjunctions, this morning the crew closed all hatches and both Dragon and Soyuz crews sheltered in their respective vehicles. Out of …
ISS Daily Summary Report – 11/12/2021
Crew-3 Launch/Dock: On Wednesday, November 10th at 8:03 PM CST, the Crew-3 Dragon Endurance lifted off from Launch Pad 39A at Kennedy Space Center. Endurance then completed a 21-hour rendezvous and successfully docked to the ISS on Thursday, November 11th at 5:33 PM CST. The hatch to Dragon Endurance was opened at 7:25 PM and …
ISS Daily Summary Report – 11/10/2021
ISS Reboost: US tracking sources identified a debris conjunction of concern yesterday with a Time of Closest Approach (TCA) approximately forty-six minutes after Crew-3 docking. As a mitigation step, ground teams opted to implement a Predetermined Debris Avoidance Maneuver (PDAM) prior to Crew-3 launch. Earlier today, the conjunction was cleared but teams progressed with the …
ISS Daily Summary Report – 11/09/2021
Payloads: ISS HAM: A crewmember initiated an ISS HAM contact with South Yarra Primary School, South Yarra, Victoria, Australia. ISS Ham Radio provides opportunities to engage and educate students, teachers, parents and other members of the community in science, technology, engineering and math by providing a means to communicate between astronauts and the ground HAM …
ISS Daily Summary Report – 11/08/2021
Endeavour Crew Undock/Landing: The Crew Dragon vehicle, Endeavour, carrying Thomas Pesquet, Shane Kimbrough, Megan McArthur, and Aki Hoshide undocked from the ISS today at 1:05 PM CT and will splash down later this evening. The completion of the 199-day Crew-2 mission marks the longest crewed capsule mission in US spaceflight history to-date and reduces the …


