Ocular Health Tonometry Test: Virts took his blood pressure, then Cristoforetti, acting as the Crew Medical Officer (CMO), performed a tonometry test of Virts as part of a regular series of tests for Ocular Health. Additional eye examinations of Virts will be performed over the next two days. The Ocular Health protocol is a systematic …
ISS Daily Summary Report – 12/26/14
Advanced Biological Research System (ABRS): Cristoforetti removed the ABRS from EXPRESS Rack 2 and prepared it for stowage to return on SPX-5. The ABRS provides two independently controlled environmental chambers capable of conducting a wide variety of biological investigations using plants, microorganisms, or small arthropods. The temperatures, lighting conditions, and atmospheric compositions within these chambers …
ISS Daily Summary Report – 12/24/14
Rodent Research: Crew powered down, removed and prepared the Rodent Research habitat for stow. At the conclusion of Rodent research-1 operations, Habitat -2 was positioned in several locations (EXPRESS Rack 1 (ER1), ER2 and Aisle deploy) to thermally characterize areas within the US Lab in preparation for future Rodent Research operations. Circadian Rhythms: Cristoforetti completed her …
ISS Daily Summary Report – 12/23/14
Neuromapping: The crew supported operations to complete objectives of the NeuroMapping Neurocognitive Test. After connecting a control pad to the HRF laptop, Virts launched the NeuroMapping application and completed the Mental Rotation I Test, the Sensorimotor Adaptation Test, the Dual Task Test while tethered, and the Mental Rotation II Test while free-floating. Wilmore took photographs …
ISS Daily Summary Report – 12/22/14
Fluids Integrated Rack (FIR) white light source replacement: During Advanced Colloids Experiment (ACE-M3) operations last week, the white light lamp burned out. Today, Wilmore opened up the FIR and replaced the lamp, enabling operations to continue. In the ACE-M-3 investigation, a model colloidal system is used to observe the microscopic behavior of liquids and gases …
ISS Daily Summary Report – 12/19/14
Cognition: Virts will act as the Cognition test operations subject. He will power on Human Research Facility (HRF) laptop, launch the Cognition application, and complete the Cognition test which includes pre-test questions and an array of cognitive tests with performance feedback. Individualized Real-Time Neurocognitive Assessment Toolkit for Space Flight Fatigue (Cognition) is a battery of …
ISS Daily Summary Report – 12/18/14
SpaceX-5 Launch Status: SpaceX-5 launch has been delayed until January 6, 2015. All of the preparatory activities to support SpaceX-5 berth are being replanned. Biolab: Wilmore and Cristoforetti inspected and performed troubleshooting for the Biolab Handling Mechanism (HM) incubator access door. The door slot was checked for potential debris and closeout pictures were taken. Additional …
ISS Daily Summary Report – 12/17/14
SpaceX-5 Launch Status: The static test fire scheduled yesterday was started, but aborted shortly after engine ignition. SpaceX is currently evaluating any impacts to the schedule. Robonaut: Virts reviewed a Robonaut video in preparation for upcoming operations. This was the first time motor power was applied to Robonaut following the addition of the legs and …
ISS Daily Summary Report – 12/16/14
3D printing in Zero G: Wilmore removed the final print coupon from the 3D Printer, concluding the objectives of the 3D printing in Zero G demonstration. Crew then removed the 3D printing equipment from the Microgravity Glove Box (MSG) and stowed the unit. The 3-D Printing in Zero-G technology demonstration experiment will show that a …
ISS Daily Summary Report – 12/15/14
Flame Extinguishment Experiment (FLEX)-2: Virts removed alignment guides to prepare the Combustion Integrated Rack (CIR) for FLEX-2 Binary-Droplet Array test points. FLEX-2 uses small droplets of fuel to study the special burning characteristics of fire in space. The FLEX-2 experiment studies the rate and manner in which fuel is burned, the conditions that are necessary …


