Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 05/21/2015

    SpaceX-6 Dragon Departure:  Overnight, the crew disconnected both power jumpers, installed the Center Disk Cover, and closed Node 2 Nadir Hatch.  They then successfully depressurized and pressure checked the Node 2/Dragon vestibule.  Dragon was unberthed from the Node 2 Nadir docking port and subsequently released by the crew utilizing the Space Station Remote Manipulator System …

    Read Full Post

    ISS Daily Summary Report – 05/20/15

    Double Cold Bag (DCB) Packing:  Virts and Kelly packed the +4 degrees Celsius (°C) DCB with conditioned Ice Bricks and samples from Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI)-2 and -32°C DCBs with Ice Bricks and frozen samples from MELFI-3.  The +4°C DCB will be returning with Cell Shape and Expression, CASIS PCG-3, …

    Read Full Post

    ISS Daily Summary Report – 05/19/15

    USOS Crew Reduced Duty Day: Today was a reduced duty day for the USOS Crew as a result of sleep shifting in preparation for SpaceX-6 departure on Thursday, 21 May 2015. Fluid Shifts Before, During and After Prolonged Space Flight and Their Association with Intracranial Pressure and Visual Impairment (Fluid Shifts): Kornienko begun his Flight …

    Read Full Post

    ISS Daily Summary Report – 05/18/2015

    Fluid Shifts Before, During and After Prolonged Space Flight and Their Association with Intracranial Pressure and Visual Impairment (Fluid Shifts): Kelly begun his Flight Day (FD) 45 Fluid Shifts Dilution Measurements today.  Upon wakeup he collected baseline saliva, blood and urine and inserted them into Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI) prior …

    Read Full Post

    ISS Daily Summary Report – 05/15/15

    Fluid Physics Experiment Facility (FPEF) Marangoni Deformation (MD) Removal: Cristoforetti removed the MD10 from the FPEF in preparation for Dynamic Surf-3 scheduled in Increment 45.  Fluid convection observations are performed of a silicone oil liquid bridge that is generated by heating the one disc higher than the other within the FPEF. By observing and understanding …

    Read Full Post

    ISS Daily Summary Report – 05/14/15

    ExHAM Installation: Kelly installed the Handhold Experiment Platform on the JEM Airlock (JEMAL) Slide Table and the Platform Adapter and Exposed Area Dosimeter and covered them with Multi-Layered Insulation (MLI).  He then installed the Handhold Experiment Platform and attached the samples for the various external experiments including the Free Space Dosimeter and ExHAM.  The JEMAL …

    Read Full Post

    ISS Daily Summary Report – 05/13/15

    Combustion Integration Rack (CIR) Multi-user Droplet Combustion Apparatus (MDCA) Replace: In preparation for the start of FLame Extinguishment Experiment (FLEX)-2J, Virts removed the MDCA Chamber Insert Assembly (CIA) from the CIR Combustion Chamber and replaced the MDCA Needles, fuel reservoirs, MDCA Igniter Tips and the MDCA Fiber Arm. Following the changeouts, he reinstalled the MDCA …

    Read Full Post

    ISS Daily Summary Report – 05/12/15

    Rodent Research-2 Center for the Advancement of Science in Space (RR-2 CASIS): Kelly performed a fixative flush and swapped the samples collected yesterday which he inserted into MELFI.  The primary objective of this research is to monitor the effects of the space environment on the musculoskeletal and neurological systems of mice as model organisms of …

    Read Full Post

    ISS Daily Summary Report – 05/11/15

    Rodent Research-2 Center for the Advancement of Science in Space (RR-2 CASIS): Kelly and Virts successfully performed the third set of four sample collections, including use of the recently recovered Bone Densitometer.  Kelly was the primary operator while Virts assisted, placing samples in containment then in Minus Eighty-Degree Laboratory Freezer in ISS (MELFI).  The crew …

    Read Full Post

    ISS Daily Summary Report – 05/08/15

    Crew Half-Duty Day: Today was a half duty day for the USOS crew following a week of CDRA operations and activities associated with SpX-6 unberthing, currently scheduled for May 21. Gene, Immune and Cellular Responses to Single and Combined Space Flight Conditions – A (Triplelux-A):  Cristoforetti closed out the Triplelux-A experiment today. She unstowed and …

    Read Full Post

Subscribe to this blog

Show Past Archives