Due to the lapse in federal government funding, NASA is not updating this website.

Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 12/17/2019

    CBEF-L (Cell Biology Experiment Facility – Left): The crew installed the CBEF-L centrifuge and performed the necessary temperature/humidity sensor relocations to support the ground-commanded checkout activities.  CBEF-L is a new JAXA subrack facility, which is an upgraded facility of the original Cell Biology Experiment Facility (CBEF) currently aboard the International Space Station (ISS). CBEF-L provides …

    Read Full Post

    ISS Daily Summary Report – 12/16/2019

    Acoustic Diagnostics: The crew set up the appropriate hardware, performed the audio measurements, and used the EveryWear application to answer the questionnaires.  The investigation tests the hearing of ISS crew members before, during, and after flight. This study assesses the possible adverse effects of noise and the microgravity environment aboard the ISS on human hearing. …

    Read Full Post

    ISS Daily Summary Report – 12/13/2019

    Gravitational References for Sensimotor Performance:  Reaching and Grasping (GRASP): The crew performed GRASP quasi-free sessions. The hardware was then stowed. The purpose of GRASP investigation is to better understand how the central nervous system (CNS) integrates information from different sensations (e.g. sight or hearing), encoded in different reference frames, in order to coordinate the hand …

    Read Full Post

    ISS Daily Summary Report – 12/12/2019

    Bio-Monitor: The crew doffed and stowed the headband and Garment hardware. The crew then connected the data unit to the controller for data downlink. Although the ISS is equipped with health and life sciences research tools, the existing instrumentation for continuous and simultaneous recording of several physiological parameters is lacking. To tackle this issue, the …

    Read Full Post

    ISS Daily Summary Report – 12/11/2019

    Bio-Monitor: The crew swapped out the garment and stowed the old garment. Although the ISS is equipped with health and life sciences research tools, the existing instrumentation for continuous and simultaneous recording of several physiological parameters is lacking. To tackle this issue, the Bio-Monitor Commissioning activity tests the Bio-Monitor facility; a wearable garment capable of …

    Read Full Post

    ISS Daily Summary Report – 12/10/2019

    Rodent Research-19 (RR-19): The crew performed RR-19 Rodent transfers from the Dragon capsule into the Habitats. Water flow was verified and foodbars were installed. The crew then stowed the Rodent Transporters. This study uses rodent models on the ISS to investigate the potential benefits of targeting the myostatin (MSTN) and activin signaling pathways to prevent …

    Read Full Post

    ISS Daily Summary Report – 12/09/2019

    Rodent Research-19 (RR-19): The crew Installed four Rodent Habitats into the Express racks 1 and 2A. This study uses rodent models on the ISS to investigate the potential benefits of targeting the myostatin (MSTN) and activin signaling pathways to prevent skeletal muscle and bone loss during spaceflight and on the recovery of muscle and bone …

    Read Full Post

    ISS Daily Summary Report – 12/08/2019

    Rodent Research-19 (RR-19): On Saturday, the crew performed the Life Science Glovebox setup in preparation for rodent research operations. The Rodent Research -19 investigation examines the Preclinical Evaluation of a Broad Spectrum Myostatin Inhibitor to Prevent Muscle and Bone Loss Due to Disuse in rodent models.  Specifically, this study is gaining a better understanding of …

    Read Full Post

    ISS Daily Summary Report – 12/06/2019

    Bio-Monitor: The crew donned the Bio-Monitor Hardware for 50 min in order to verify communication telemetry. Although the ISS is equipped with health and life sciences research tools, the existing instrumentation for continuous and simultaneous recording of several physiological parameters is lacking. To tackle this issue, the Bio-Monitor Commissioning activity tests the Bio-Monitor facility; a …

    Read Full Post

    ISS Daily Summary Report – 12/05/2019

    CBEF-L (Cell Biology Experiment Facility-L): The crew performed the Humidifier Setup for CBEF Incubator Unit and inserted the LTL distribution box into the SAIBO rack. The crew then performed a setup of the Saibo Rack to a nominal configuration including connecting the CBEF Video Cable to IPU and sealed the CBEF-SAIBO sealing with Aluminium tape.  …

    Read Full Post

Subscribe to this blog

Show Past Archives