Suggested Searches

Artemis

    SpaceX Completes Engine Tests for NASA’s Artemis III Moon Lander

    The 281-second throttle test demonstrated the engine’s ability to meet the demands of a descent burn to the lunar surface.

    NASA is working with SpaceX to develop its Starship human landing system (HLS) for use during the Artemis III and Artemis IV missions to land American astronauts near the South Pole of the Moon. The Starship HLS will be powered by two variants of the company’s Raptor engines—one optimized to operate in atmospheric pressure at sea-level …

    Read Full Post

    First RS-25 Engine Installed to NASA’s Artemis II Moon Rocket

    Engineers and technicians from Aerojet Rocketdyne and Boeing at NASA’s Michoud Assembly Facility in New Orleans have installed the first of four RS-25 engines to the core stage for NASA’s Space Launch System rocket that will help power the first crewed Artemis mission to the Moon. The yellow core stage is seen in a horizontal position in the final assembly area at Michoud. One RS-25 engine, engine number E2059, has been installed in the top left corner at the base of the 212-foot-tall core stage.

    Technicians at NASA’s Michoud Assembly Facility in New Orleans have installed the first of four RS-25 engines on the core stage of the agency’s SLS (Space Launch System) rocket that will help power NASA’s first crewed Artemis mission to the Moon. During Artemis II, NASA astronauts Reid Wiseman, Victor Glover, Christina Koch, and CSA (Canadian …

    Read Full Post

    Mobile Launcher Arrives at Launch Pad 39B for Artemis ll Preps

    The top part of mobile launcher 1, carried by the crawler-transporter 2, rolls out from its park site location to Launch Pad 39B at NASA’s Kennedy Space Center in Florida on Aug. 16, 2023.

    After an approximately four-mile journey over the course of two days, mobile launcher 1 arrived on Aug. 17 at Launch Pad 39B from its park site location at NASA’s Kennedy Space Center in Florida. It will remain at the pad for several months as teams with NASA’s Exploration Ground Systems Program prepare for Artemis ll, …

    Read Full Post

    Mobile Launcher Rolls to Launch Pad for Artemis ll Testing

    Under bright blue skies, the mobile launcher 1 is seen behind the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida on Aug. 16, 2023 as it gets ready to roll to Launch Pad 39B.

    Mobile launcher 1 is on its way to Launch Pad 39B at NASA’s Kennedy Space Center in Florida to prepare for Artemis ll, the first crewed mission on the agency’s path to establishing a long-term presence at the Moon under Artemis. The ground structure began its trek from the west park site at approximately 8:27 …

    Read Full Post

    Artemis II Orion Crew Module Acoustic Testing Complete

    Artemis II crew members, shown inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, check out their Orion crew module on Aug. 8, 2023. From left are: Victor Glover, pilot; Reid Wiseman, commander; Christina Hammock Koch, mission specialist; and Jeremy Hansen, mission specialist. The crew module is undergoing acoustic testing ahead of integration with the European Service Module. Artemis II is the first crewed mission on NASA’s path to establishing a long-term lunar presence for science and exploration under Artemis.

    On Aug. 13, engineers and technicians inside the high bay of the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida successfully completed a series of acoustic tests to ensure the Orion spacecraft for NASA’s Artemis II mission can withstand the speed and vibration it will experience during launch and throughout …

    Read Full Post

    Artemis II Crew Visits Naval Base San Diego for Recovery Training

    Artemis II astronauts inside the Vehicle Advanced Demonstrator for Emergency Recovery (VADR) during a tour of Naval Base San Diego.

    The Artemis II crew – NASA astronauts Reid Wiseman, Victor Glover, Christina Hammock Koch, and Canadian Space Agency astronaut Jeremy Hansen – visited Naval Base San Diego on July 19 ahead of the first Artemis II recovery test in the Pacific Ocean, Underway Recovery Test-10. The test will build on the success of Artemis I …

    Read Full Post

    Orion Heat Shield Installed for NASA’s Artemis II Mission

    The heat shield for the Artemis II Orion spacecraft

    On June 25, 2023, teams completed installation of the heat shield for the Artemis II Orion spacecraft inside the high bay of the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida. The 16.5-foot-wide heat shield is one of the most important systems on the Orion spacecraft ensuring a safe return …

    Read Full Post

    NASA’s Artemis II European Service Module is Making FAST Moves

    Teams are performing final checkouts of the Orion spacecraft’s service module before integrating the crew and service modules for Artemis II, the first Artemis mission with crew. In parallel, technicians from Airbus will conduct inspections of the solar array wings following the successful completion of service module acoustic testing in May, which ensured the service …

    Read Full Post

    Intuitive Machines Lunar Landing Site Moves to South Pole

    Intuitive Machines' Nova-C lunar lander inside the company's facility at the Houston Spaceport. Credits: Intuitive Machines.

    NASA, in cooperation with Intuitive Machines, is moving the landing site for the first Commercial Lunar Payload Services (CLPS) mission to Moon’s South Pole as an important first step in managing risks for future Artemis landings. One of the first lunar payload deliveries under NASA’s CLPS initiative was awarded to Intuitive Machines in May 2019. …

    Read Full Post

    Artemis II Orion Service Module Completes Acoustic Testing

    Engineers recently completed a series of acoustic tests on the European Service Module for NASA’s Artemis II mission while inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida. During the testing, engineers surrounded the service module with large speakers and attached microphones, accelerometers, and other equipment to measure the …

    Read Full Post