Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 02/18/14

    Orbital 1 Departure: Today, the Robotics Ground Controllers powered up the Mobile Servicing System (MSS) in the hot backup configuration for Cygnus unberthing and release.  Flight Engineer (FE)-6 Wakata and FE-3 Hopkins demated Cygnus from the Node 2 Nadir Active Common Berthing Mechanism (CBM) and used the Space Station Remote Manipulator System (SSRMS) to uninstall …

    Read Full Post

    ISS Daily Summary Report – 02/17/14

    Cube Satellite (CubeSat) Operations:  Four CubeSats were successfully launched by JAXA Robotic Flight Controllers from NanoRacks CubSat Deployer (NRCSD) locations 4 and 5 on Saturday, February 15th. The commands to launch the CubeSats from these locations needed to be sent several times in order for the deployer doors to open.  Previous attempts last week to …

    Read Full Post

    ISS Daily Summary Report – 02/14/14

    Cube Satellite (CubeSat) Deploys:  Four additional CubeSats were deployed overnight from the NanoRacks CubeSat Deployers (NRCSDs) by JAXA Robotic Flight Controllers, for a total of 12 CubeSats launched this week.  Unsuccessful attempts to launch from NRCSD locations 4 and 5 are under investigation by NASA NRCSD Teams. Additional attempts will be made to launch those …

    Read Full Post

    ISS Daily Summary Report – 02/13/14

    Cube Satellite (CubeSat) Deploys:  After the failure to launch satellites from 2 NanoRacks CubeSat Deployers (NRCSDs) yesterday, Payload Operations Integration Center (POIC) console teams were able to confirm from photographs taken by Flight Engineer (FE)-6 Wakata that the push-pin assemblies on all NRCSDs located on the Japanese Experiment Module Remote Manipulator System (JEMRMS) were in …

    Read Full Post

    ISS Daily Summary Report – 02/12/14

    Cube Satellite (CubeSat) Deploys:  Following yesterday’s successful launch of four CubeSats, the Japanese Experiment Module (JEM) Remote Manipulator System (RMS) was used this morning to launch two more satellites. An unsuccessful attempt was made to launch additional satellites from deployers 3 and 5.  Ground teams are investigating the anomaly. The remaining satellites in the NRCSDs …

    Read Full Post

    ISS Daily Summary Report – 02/11/14

    Cube Satellite (CubeSat) Deploys: Yesterday the Japanese Experiment Module (JEM) Remote Manipulator System (RMS) was used to move 8 NanoRacks CubSat Deployers (NRCSDs) from the JEM Airlock to the deploy position.  These NRCSDs contain a total of 16 small cube satellites. Today JAXA Robotic Flight Controllers successfully deployed the first 4 CubeSats.  The remaining satellites …

    Read Full Post

    ISS Daily Summary Report – 02/10/14

    Cosmo Shoot Operation:  Flight Engineer (FE)-6 Wakata set up JAXA’s Cosmo Shoot laptop and 4K camera in the Cupola and captured images of the US west coast, India and the Himalayas, Africa and South America. Synchronized Position Hold, Engage, Reorient, Experimental Satellites (SPHERES) Resonant Inductive Near-field Generation System (RINGS):  FE-6 Wakata integrated the RINGS hardware …

    Read Full Post

    ISS Daily Summary Report – 02/07/14

    FGB Power and Data Grapple Fixture (PDGF) Resistance Test:   Today Flight Engineer (FE)-4 Tyurin disconnected Russian to American Converter Unit (RACU)-5 and RACU-6 Space Station Remote Manipulator System (SSRMS) system power from the FGB PDGF Connection Panel.  FE-6 Wakata and Tyurin then performed a connection resistance test which confirmed that the SSRMS system and payloads …

    Read Full Post

    ISS Daily Summary Report – 02/06/14

    Medaka Osteoclast 2:  Flight Engineer (FE)-6 Wakata activated the Multi-Purpose Small Payload Rack (MSPR) Hub unit and installed the Medaka Chamber in the fluorescent microscope for observation of a Medaka sample over the next seven days. Preparation for Cube Satellite (CubeSat) Deploys:  Last Friday, January 31st, Wakata experienced an issue installing the NanoRacks CubeSat Deployer …

    Read Full Post

    ISS Daily Summary Report – 02/05/14

    Progress 54P Launch and Dock: Today, 54P launched successfully from the Baikonur Cosmodrome at 10:23am CST. After a nominal ascent then performing a four orbit rendezvous, the spacecraft docked automatically to the ISS DC-1 docking port at 4:22pm CST. The Progress is delivering more than 1400 kg of cargo to the ISS. Microbiome Investigation: Flight …

    Read Full Post

Subscribe to this blog

Show Past Archives