ISS On-Orbit Status Report

    ISS Daily Summary Report – 07/18/14

    Force Shoes: Flight Engineer (FE)-5 Wiseman conducted an Advanced Resistive Exercise Device (ARED) exercise session using Force Shoes which were calibrated during Treadmill 2 (T2) exercise last week. The data from the ARED exercise session will be used to measure the loads experienced during ARED exercise. Robonaut Operations: Commander (CDR) Swanson continued with Robonaut upgrade …

    Read Full Post

    ISS Daily Summary Report – 07/17/14

    Orbital-2 (Orb-2) Ingress:  Following yesterday’s successful capture and berthing of Cygnus, the crew completed vestibule outfitting, ingressed the vehicle, and began transferring cargo to ISS. Robonaut Operations: Commander (CDR) Swanson removed the Robonaut panels and battery backpack to gain access to the Robonaut processor and board. Tomorrow, Swanson will continue Robonaut operations. The Robonaut upgrades …

    Read Full Post

    ISS Daily Summary Report – 07/16/14

    Orbital-2 (Orb-2) Capture/Berthing: The crew successfully captured Cygnus using the Space Station Remote Manipulator System (SSRMS) at 5:39 am CDT. The ground used the Space Station Remote Manipulator System (SSRMS) to maneuver Cygnus into position near the Node 2 Nadir berthing port for Passive Common Berthing Mechanism (PCBM) inspection and berthing. Following berthing, the crew proceeded …

    Read Full Post

    ISS Daily Summary Report – 07/15/14

    Burning and Suppression of Solids (BASS)-II Operations: Flight Engineer (FE)-5 Wiseman completed two flame tests for the BASS-II investigation which examines the burning and extinction characteristics of a wide variety of fuel samples in microgravity. The experiment will guide strategies for materials flammability screening for use in spacecraft as well as provide valuable data on …

    Read Full Post

    ISS Daily Summary Report – 07/14/14

    Orbital-2 (Orb-2) Launch: Orb-2 launched successfully yesterday, achieved a nominal orbit and the solar array was successfully deployed.  Cygnus has executed several phasing burns to support rendezvous and grapple scheduled for Wednesday, July 16 at 5:39 am CDT followed by berthing to Node 2 (N2) Nadir.  The Orbital team is working through an issue with …

    Read Full Post

    ISS Daily Summary Report – 07/13/14 (Orbital Launch Status)

    Orbital-2 (Orb-2) Launch: Orb-2 launched successfully on Sunday, July 13 at 11:52 am CDT. Orb-2 achieved a nominal orbit and the solar array was successfully deployed.  Grapple is scheduled for Wednesday, July 16 at 5:39 am CDT followed by berthing to Node 2 (N2) Nadir.  Ingress is scheduled for Thursday, July 17.

    Read Full Post

    ISS Daily Summary Report – 07/11/14

    Orbital-2 (Orb-2) Launch: Launch is currently scheduled for Sunday, July 13 at 11:52 am CDT. Grapple is scheduled for Wednesday, July 16 at 5:37 am CDT followed by berthing to Node 2 (N2) Nadir.  Ingress is scheudled for Thursday, July 17. Force Shoes: Flight Engineer (FE)-5 Wiseman performed Treadmill 2 (T2) exercise using the Force …

    Read Full Post

    ISS Daily Summary Report – 07/10/14

    Capillary Flow Experiment (CFE) Interior Corner Flow (ICF) Test: Flight Engineer (FE)-6 Gerst set up hardware on the Maintenance Work Area (MWA) and conducted ICF test using the ICF8 hardware which contains a segmented, 50 degree snow cone section. CFE ICF studies capillary flow in interior corners of vessels with various geometries. Structured inside tanks …

    Read Full Post

    ISS Daily Summary Report – 07/09/14

    Burning and Suppression of Solids (BASS)-II Operations: FE-5 Wiseman conducted seven flame tests for the BASS-II investigation. Six of the samples were fabric and the seventh was an acrylic, spherical material. The BASS-II investigation examines the burning and extinction characteristics of a wide variety of fuel samples in microgravity. The BASS-II experiment will guide strategies …

    Read Full Post

    ISS Daily Summary Report – 07/08/14

    Burning and Suppression of Solids (BASS)-II Operations: Flight Engineer (FE)-5 Wiseman conducted six flame tests for the BASS-II investigation. Clear and black rods were burned under the same conditions for comparison. The BASS-II investigation examines the burning and extinction characteristics of a wide variety of fuel samples in microgravity. The BASS-II experiment will guide strategies …

    Read Full Post