    ISS Daily Summary Report – 11/13/15

    Direct Current Switching Unit (DCSU) 1B Remote Bus Isolator (RBI) 1 Trip – At ~11:55am CST DCSU 1B RBI 1 experienced a trip on Friday taking all power from the 1B Power Channel. Numerous systems were affected including core avionics.  Command and Control (C&C) and Guidance Navigation & Control (GNC) Multiplexer/Demultiplexers (MDMs) automatically transitioned to …

    Read Full Post

    ISS Daily Summary Report – 11/12/15

    Synchronized Position Hold, Engage, Reorient, Experimental Satellites (SPHERES) Slosh: After experiencing issues with SPHERES batteries and a hard drive, the SPHERES Slosh Run today was postponed to a later date.  Ground experts are investigating the source of the problems.   Sleep Log:  Kelly recorded a Sleep Log entry today.  The Sleep ISS-12 experiment monitors ambient …

    Read Full Post

    ISS Daily Summary Report – 11/11/15

    Nitrogen/Oxygen Recharge System (NORS) Airlock Interface Kit (AIK) Installation:  Kelly prepared the US Airlock in support of NORS AIK install by removing closeout panels and flexible ventilation ducting.  Yui then assisted Kelly with the installation of the NORS primary and redundant power cables.  The NORS AIK activities will continue tomorrow with leak checks extending through …

    Read Full Post

    ISS Daily Summary Report – 11/10/15

    Post Extravehicular Activity (EVA) Activities:  Following completion of EVA #33 on November 6, the crew was given a day off on Monday.  Today, the crew performed cleanup activities, including EVA loop scrubs with water conductivity tests, Extravehicular Mobility Unit (EMU) dry out, EVA tool stow, EVA camera disassembly and US Airlock deconfiguration.   Sally RideEarth …

    Read Full Post

    ISS Daily Summary Report – 11/6/15

    Extravehicular Activity (EVA) #33:  Kelly and Lindgren egressed the Airlock at 5:22am CST in order to perform P6 Return To Original Configuration (RTOC) EVA #33.  The Phased Elapsed Time (PET) for today’s EVA was 7 hours and 48 minutes.  The objectives for the EVA that were completed are as follows:   Open Photo Voltaic Radiator …

    Read Full Post

    ISS Daily Summary Report – 11/5/15

    Crew Reduced Duty Day:  Today was a reduced duty day for the US crew in advance of tomorrow’s EVA.   Extravehicular Activity (EVA) Preparations:  The US crew members conducted final preparations to the Equipment Lock, Extravehicular Mobility Units (EMUs), and ancillary hardware.  They also reviewed related procedures and briefing packages then conducted a conference with …

    Read Full Post

    ISS Daily Summary Report – 11/4/15

    Extravehicular Activity (EVA) Preparations:  Kelly and Lindgren prepared for Friday’s EVA by reviewing Fluid Quick Disconnect (QD) training material, auditing and configuring EVA tools, and making changes to the ISS EVA Systems Checklist book and Cuff Checklist procedures.  Additionally, they installed Rechargeable EVA Battery Assemblies (REBA) on Extravehicular Mobility Unit (EMU) suits 3003 and 3010. …

    Read Full Post

    ISS Daily Summary Report – 11/3/15

    Observation Analysis of Smectic Islands in Space (OASIS) Sample Exchange:  Kononenko performed an OASIS sample exchange today, installing the fourth of four sample cartridges into the experiment hardware housed in the Microgravity Science Glovebox (MSG). OASIS studies the unique behavior of liquid crystals in microgravity, including their overall motion and the merging of crystal layers …

    Read Full Post

    ISS Daily Summary Report – 11/2/15

    Neuromapping:  On Saturday Kelly completed a NeuroMapping Neurocognitive test on a Human Research Facility laptop.  The Neuromapping experiment studies whether long-duration spaceflight causes any changes to the brain, including brain structure and function, motor control, and multi-tasking; as well as measuring how long it takes for the brain and body to recover from those possible …

    Read Full Post

    ISS Daily Summary Report – 10/29/15

    Post Extravehicular Activity (EVA):  Due to the EVA yesterday, the US crew was scheduled for a half duty day.  This morning, Kelly and Lindgren completed post-EVA health assessments.  Kelly, Yui and Lindgren then participated in an EVA debrief session with ground specialists.  Later, Kelly remated wire harness W0142 to the Node 1 Starboard Gore Panel.  …

    Read Full Post