Suggested Searches

Missions

    Launch Director Gives “Go” to Begin Cryogenic Operations

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    Artemis Launch Director Charlie Blackwell-Thompson has given the “go” to officially begin loading propellants into the Space Launch System rocket.  Tanking begins with chilldown of the core stage liquid oxygen transfer line. NASA TV coverage will begin at 5:45 a.m. http://www.nasa.gov/live.

    Read Full Post

    Mission Managers Give “Go” to Proceed Toward Tanking Operations for Artemis I

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    The Artemis I Mission Management Team has given the “go” to proceed toward tanking operations. Weather conditions remain 60% favorable at the beginning of the two-hour launch window which opens at 2:17 p.m. EDT Sept. 3, with conditions improving to 80% favorable toward the later part of the window. Artemis I launch director Charlie Blackwell-Thompson …

    Read Full Post

    Weather Remains 60% Favorable for Artemis I Launch, Sept 3.

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    Following the Artemis I pre-launch briefing, meteorologists with the U.S. Space Force Space Launch Delta 45 predict a 60% chance of favorable weather conditions at the beginning of the two-hour launch window that opens at 2:17 p.m. EDT Sept 3, increasing to an 80% chance of favorable weather conditions toward the later part of the …

    Read Full Post

    Artemis I Launch Update: Mission Management Team Gives “Go” for Sept. 3

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    The Artemis I mission management team met this afternoon to review the status of the operations and have given a “go” for a Sept. 3 launch attempt of the Space Launch System rocket and Orion spacecraft. Since the previous launch attempt on Monday, Aug. 29, teams have updated procedures, practiced operations and refined timelines. Over …

    Read Full Post

    NASA Targets Sept. 3 for Next Artemis I Moon Mission Launch Attempt

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    NASA will target Saturday, Sept. 3 at 2:17 p.m. EDT, the beginning of a two-hour window, for the launch of Artemis I, the first integrated test of NASA’s Orion spacecraft, Space Launch System (SLS) rocket, and the ground systems at the agency’s Kennedy Space Center in Florida. Mission managers met Tuesday to discuss data and …

    Read Full Post

    Launch Attempt Scrubbed

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    The launch director halted today’s Artemis I launch attempt at approximately 8:34 a.m. EDT. The Space Launch System rocket and Orion spacecraft remain in a safe and stable configuration. Launch controllers were continuing to evaluate why a bleed test to get the RS-25 engines on the bottom of the core stage to the proper temperature …

    Read Full Post

    Teams Continue to Hold While Data Gathering Continues

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    Teams are in a hold in the countdown at T-40 minutes while engineers evaluate why the bleed test to condition the engines was not successful. Engineers are looking at options to gather as much data as possible. The Artemis I rocket and spacecraft are in a stable, safe condition.

    Read Full Post