Ames Wind Tunnel Test Request Form and Test Planning Information
The Ames Wind Tunnel Operations Division welcomes all inquiries regarding potential tests in our facilities. Initial contact should be made as early as possible so that a place can be assured on the schedule and all long lead items such as hardware design and fabrication can be accomplished. It is best if this initial contact can be made at least seven months before the desired test time.
All that is necessary is to fill out a Test Request Form. After review by the Ames Wind Tunnel staff, a Test Request Meeting may be scheduled for further mutual discussion.
Any questions can be directed to Maureen Delgado at (650) 604-1620.