Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 2/17/2021

    Payloads Confined Combustion: The crew prepare Confined Combustion samples for flame test operations and conducted tests with ground assistance from the Principle Investigator (PI). Confined Combustion examines the behavior of flame as it spreads in differently shaped confined spaces in microgravity. Flame spread observations are translated into mathematical models for use in understanding the results …

    Read Full Post

    ISS Daily Summary Report – 2/16/2021

    Payloads Three-dimensional Microbial Mapping of ISS Environment (3DMM): The crew performed surface collections in PMM and the Airlock.  Surfaces in the ISS contain microbes and associated biomolecules excreted by these microorganisms.  3DMM uses DNA sequencing and other analyses to construct a 3D map of bacteria and bacterial products throughout the Station.  The team also plans …

    Read Full Post

    ISS Daily Summary Report – 2/12/2021

    Payloads 3DMM: The crew continued the 3DMM experiment by collecting samples from the Node 2 area. This investigation will conduct a series of over 800 swab sample collections throughout several modules of the International Space Station. Surfaces in the space station contain microbes and associated biomolecules excreted by these microorganisms. Three-dimensional Microbial Mapping of ISS …

    Read Full Post

    ISS Daily Summary Report – 2/11/2021

    Payloads ASTRORAD Vest: In a continuation of the Astrorad series of activities, the crew donned and doffed the payload hardware and then answered a survey.  The AstroRad vest is a personal protective equipment (PPE) device which functions as a radiation shield for astronauts. The AstroRad shields astronauts from space-borne ionizing radiation in an efficient way, …

    Read Full Post

    ISS Daily Summary Report – 2/09/2021

    76 Progress Undock: The Russian 76P cargo vehicle successfully departed ISS from the Russian Segment DC-1 port.  ISS successfully maneuvered to the +ZVV undocking attitude on USOS US Thrusters Only (USTO) control. Upon vehicle departure, ISS was maneuvered back to the +XVV Torque Equilibrium Attitude (TEA) and the ISS Motion Control System (MCS) transitioned to Momentum …

    Read Full Post

    ISS Daily Summary Report – 2/08/2021

    Payloads 3DMM: The crew collected swab samples from Node 1. This investigation will conduct a series of over 1000 swab sample collections throughout several modules of the ISS. Surfaces in the space station contain microbes and associated biomolecules excreted by these microorganisms. Three-dimensional Microbial Mapping of ISS Environment (3DMM) uses DNA sequencing and other analyses …

    Read Full Post

    ISS Daily Summary Report – 2/04/2021

    Payloads FLARE (Solid Combustion Assembly): The crew removed and replaced the FLARE-Solid Combustion Experiment Module (SCEM) Igniter for Experiment Insert #2. Fundamental Research on International Standard of Fire Safety in Space – Base for Safety of Future Manned Missions (FLARE), a Japan Aerospace Exploration Agency (JAXA) investigation, explores the flammability of materials in microgravity. Various …

    Read Full Post

    ISS Daily Summary Report – 2/03/2021

    Payloads Cell Biology Experiment Facility-L (CBEF-L): The crew connected the CBEF-L Alt power and data umbilicals to the Saibo Rack Z-panel. The JAXA Experiment Laptop-2 was also setup for upcoming configuration ops.  CBEF-L is a Japan Aerospace Exploration Agency (JAXA) new subrack facility, which is an upgraded facility of the original Cell Biology Experiment Facility …

    Read Full Post

    ISS Daily Summary Report – 2/02/2021

    Payloads Cell Biology Experiment Facility-L (CBEF-L): The crew connected video, power and data cables to the Cell Biology Experiment Facility (CBEF) Control Equipment (CE). CBEF-L is a Japan Aerospace Exploration Agency (JAXA) new subrack facility, which is an upgraded facility of the original Cell Biology Experiment Facility (CBEF) currently aboard the International Space Station (ISS). …

    Read Full Post

    ISS Daily Summary Report – 2/01/2021

    USOS Extravehicular Activity (EVA) #70 – ISS Upgrades II: EV1 Michael Hopkins and EV2 Victor Glover performed a 5 hour 20 minute EVA and completed the following tasks in support of ISS upgrades: P4 AP Relocate P4 Li-ION & DCSU Bolts P4 H-Fixture Removal CP3 Camera Group R&R JEMRMS WVE R&R CP13 HD Camera Installation …

    Read Full Post

Subscribe to this blog

Show Past Archives