Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 8/12/2022

    Payloads: Butterfly IQ USND: The crew set up the appropriate hardware and performed the fifth medical technology demonstration of the Butterfly Ultrasound Device. Butterfly IQ Ultrasound demonstrates the effectiveness of a portable ultrasound device used in conjunction with a mobile computing device in the space environment. Such commercial off-the-shelf technology could provide important medical capabilities …

    Read Full Post

    ISS Daily Summary Report – 8/11/2022

    Payloads: Cold Atom Lab (CAL): The crew used a Grab Sample Container (GSC) to sample the air around the Cold Atom Lab location. The GSC will be returned to the ground for analysis of the sample. The CAL produces clouds of atoms chilled to about one ten billionth of a degree above absolute zero — …

    Read Full Post

    ISS Daily Summary Report – 8/10/2022

    ISS Reboost: Today, the ISS performed a reboost using the Aft Progress 81P R&D thrusters. This reboost was the first of three reboosts to set up proper conditions for 68S 2-orbit rendezvous on September 21 and 67S landing on September 29. The burn duration was 2 minutes 45 seconds with a Delta-V of 0.3 m/s. …

    Read Full Post

    ISS Daily Summary Report – 8/09/2022

    Payloads: Immunosenescence: The fourth BioCell media exchange was performed for the Immunosenescence experiment. The media is replaced periodically as the cells consume the nutrients in the media and waste products accumulate. Microgravity as a Model for Immunological Senescence and its Impact on Tissue Stem Cells and Regeneration (Immunosenescence) studies the effects of microgravity on cells …

    Read Full Post

    ISS Daily Summary Report – 8/08/2022

    Payloads: Combustion Integrated Rack/Solid Fuel Ignition and Extinction (CIR/SoFIE): The crew gained access to the interior of the CIR rack, and replaced the CIR Fuel and Oxidizer Management Assembly (FOMA) Calibration Unit. The FOMA calibration is performed periodically to help verify accurate readings from the various measurement systems in the CIR. The CIR facility includes …

    Read Full Post

    ISS Daily Summary Report – 8/05/2022

    Payloads: Cold Atom Lab (CAL): Following last week’s repair of the compression fittings in the Moderate Temperature (MTL) coolant line for CAL, a series of visual leak checks have followed and all been good (no leaks reported). The CAL produces clouds of atoms that are chilled to about one ten billionth of a degree above …

    Read Full Post

    ISS Daily Summary Report – 8/04/2022

    Payloads: Cerebral Augmentation: The crew set up the appropriate hardware and participated in a Cerebral Autoregulation science session. As the body’s most important organ, the brain needs a strong and reliable blood supply, so the brain is capable of self-regulating blood flow even when the heart and blood vessels cannot maintain an ideal blood pressure. …

    Read Full Post

    ISS Daily Summary Report – 8/03/2022

    Payloads: Astrobee-Zero Robotics: The crew assisted with the performance of the competition finals. In this experiment session, student teams compete by using the Astrobee robots to spell out 3-6 letter passwords for the crew. The password is needed for a fictional situation in which two astronauts need to enter a password to restart power systems. …

    Read Full Post

    ISS Daily Summary Report – 8/02/2022

    Payloads: ESA Biofilms-2: Following the completion of the 14-day experiment session, the twenty-four Experiment Containers (ECs) were removed from the Kubik 5 and Kubik 6 facilities and packed for return to the ground. In the Kubik experiment Biofilms-2, three bacteria species (A. radioresistens, Staphylococcus sp. and C. metallidurans) are grown on metal surfaces in a …

    Read Full Post

    ISS Daily Summary Report – 8/01/2022

    Payloads: Airborne Particulate Monitor (APM): Experiment data was transferred from the APM for subsequent downlink to the ground. Following this, the APM hardware was relocated from Node 3 to the US Lab. Air quality in crewed spacecraft is important for keeping astronauts healthy and comfortable. Although requirements exist for maximum allowable concentrations of particulate matter, …

    Read Full Post

Subscribe to this blog

Show Past Archives