ISS On-Orbit Status Report

    ISS Daily Summary Report – 04/13/16

    SPHEROIDS De-installation: Following yesterday’s completion of the 2-day SPHEROIDS experiment run, Peake de-installed the SPHEROIDS experiment containers from Kubik 5 and transferred the containers into Minus Eight-degree Freezer for ISS (MELFI). The SPHEROIDS experiment investigates the effects of microgravity on endothelial cell function with respect to blood vessel formation, cellular proliferation, and programmed cell death. …

    Read Full Post

    ISS Daily Summary Report – 04/12/16

    SPHEROIDS Temperature and Power Check: The ESA SPHEROIDS experiment completed its two day experiment run. Yesterday, Peake retrieved the SPHEROIDS hardware from SpaceX-8 (SpX-8) and installed the containers into the Kubik. Today he will completed a temperature and power check. The experiment investigates the effects of microgravity on endothelial cell function with respect to blood …

    Read Full Post

    ISS Daily Summary Report – 04/11/16

    SpaceX (SpX)-8 Launch, Capture and Berth: SpX-8 launched successfully at 3:43 PM CDT Friday. Capture and berthing to the Node 2 nadir port occurred on Sunday at 6:24 AM CDT, and berthing occurred approximately 3 hours later. This morning, the USOS crew ingressed the Dragon and began transferring Cargo Transfer Bags (CTBs), unpacking Double Cold …

    Read Full Post

    ISS Daily Summary Report – 04/8/16

    SpaceX-8 launch:  SpaceX-8’s Dragon capsule was successfully launched from Cape Canaveral, Florida at 3:43 PM Central time.  Solar arrays have been deployed.  Capture and berthing are planned for Sunday, April 10.

    Read Full Post

    ISS Daily Summary Report – 04/7/16

    Meteor Troubleshooting and Camera Installation:  Williams performed troubleshooting on the Meteor payload software issues that were experienced yesterday, but the troubleshooting was unsuccessful.  He then began installing the hardware into the Window Observational Research Facility (WORF).  The hardware installation was partially completed, with the camera and the WORF hatch remaining to be installed. Meteor’s first …

    Read Full Post

    ISS Daily Summary Report – 04/5/16

    Muscle Atrophy Research and Exercise System (MARES): Peake completed partial checkout activities for the MARES investigation by placing Percutaneous Electrical Muscle Stimulator (PEMS) electrodes on the designated area of the right leg and successfully executing ankle exercise sessions.  Software issues were discovered which prevented the remaining activities from being completed.  These will be rescheduled for …

    Read Full Post

    ISS Daily Summary Report – 04/4/16

    63 Progress (63P) Docking: 63P docked successfully to the Service Module (SM) Aft docking port on Saturday. Capture occurred at 12:57 PM CDT with hook closure at 1:03 PM CDT.   Japan Aerospace Exploration Agency (JAXA) Protein Crystal Growth (PCG) Installation: On Sunday, Peake installed 2 canisters containing 38 protein samples into the PCRF to …

    Read Full Post

    ISS Daily Summary Report – 04/1/16

    Strata-1 Payload Activation: Earlier this morning Peake moved the Space Acceleration Measurement System (SAMS) sensor enclosure from the Japanese Experiment Module (JEM) to the Strata-1 payload for activation and checkout activities. When Peak switched the main power switch on, an overcurrent trip occurred on the Solid State Power Control Module (SSPCM) channel for Express Rack …

    Read Full Post

    ISS Daily Summary Report – 03/31/16

    63 Progress (63P) Launch: 63P launched at 11:23AM CDT today. Orbital insertion was nominal, and the vehicle is performing well.  Docking is scheduled to occur this Saturday at 1:00PM CDT.   Thermolab De-instrumentation for Circadian Rhythms: Peake removed the double sensors and the Thermolab Unit before cleaning and stowing the equipment after completing the measurement …

    Read Full Post

    ISS Daily Summary Report – 03/30/16

    61 Progress (61P) Undock: 61P undocked from the Service Module (SM) aft port today at 9:14 AM CDT. The deorbit burn is scheduled for Friday, April 8 at 8:30AM CDT following a non-ISS related, free-flight experiment planned for April 3-7. Fine Motor Skills:  Kopra, Peake, and Williams each completed a session of the Fine Motor …

    Read Full Post