Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 09/26/2016

    Multi-Purpose Experiment Platform (MPEP)/Small Fine Arm Attachment Mechanism (SAM) removal: FE-5 retracted the Japanese Experiment Module Airlock (JEMAL) slide table into the module and removed the MPEP and SAM.  Tomorrow, the crew will ingress Pressurized Mating Adapter-2 (PMA2) to retrieve the JEM ORU Transfer Interface (JOTI) and install it on the Slide Table to support …

    Read Full Post

    ISS Daily Summary Report – 09/23/2016

    NanoRack Cubesat Deployer (NRCSD) Removal: FE-5 removed the NanoRack deployer from the Multi-Purpose Experiment Platform (MPEP) Japanese Experiment Module Airlock (JEMAL) Slide Table, following the successful deployments of 8 DoveSat satellites last week.  The next use of the JEMAL will be for Robotics External Leak Locator (RELL), which aims to demonstrate that commercial off-the-shelf (COTS) …

    Read Full Post

    ISS Daily Summary Report – 09/22/2016

    Story Time From Space: FE-6 completed the video recording that was started yesterday that demonstrates how a balance scale can be used to exhibit balance in microgravity.  Story Time From Space combines science literacy outreach with simple demonstrations recorded aboard the ISS. Crew members read five science, technology, engineering and mathematics-related children’s books in orbit, …

    Read Full Post

    ISS Daily Summary Report – 09/21/2016

    Multi-Purpose Small Payload Rack (MSPR) Combustion Chamber Adapter Plate Attachment: FE-5 installed the Combustion Chamber adapter plate in the MSPR Work Volume.  Next week, the crew will be installing and with ground support, initiating the Group Combustion experiment. The Group Combustion investigation tests a theory that fuel sprays change from partial to group combustion as …

    Read Full Post

    ISS Daily Summary Report – 09/20/2016

    Japanese Experiment Module Airlock (JEMAL) Repressurization: This morning, FE-5 initiated a repress of the JEMAL then performed a leak check of the airlock.  Later this week, the crew will remove the NRCSD from the airlock.  Water Monitoring Suite – Microbial Monitoring System (WMS – MMS): FE-6 began operations with the MMS subset of the WMS …

    Read Full Post

    ISS Daily Summary Report – 09/19/2016

    Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI)-2 Auto-Stop Transition: On Sunday, ground teams received notification that MELFI-2 in the Japanese Experiment Module (JEM) transitioned to Auto-stop.  The Brayton Motor powered off, and the rack maintained power and good Low Temperature Loop (LTL) flow.  The Cold Stowage team noted that the way the MELFI …

    Read Full Post

    ISS Daily Summary Report – 09/16/2016

    Plant Ribonucleic Acid (RNA) Regulation Harvest: FE-6 removed the European Modular Cultivation System (EMCS) Seed Cassettes from EMCS Rotors A and B stowed them in an EMCS Cold Stowage Pouch.  The removed cassettes were then stowed in MELFI.  New Experiment Container (EC) Seed Cassettes were installed into the EMCS and will be grown for approximately …

    Read Full Post

    ISS Daily Summary Report – 09/15/2016

    NanoRack Cubesat Deployer (NRCSD) #9 Deployment: Overnight, ground controllers deployed the remaining three of four pairs of Planet Lab DoveSats from the NRCSD #9.  This deployment titled “Flock 2” is a fleet of nanosatellites designed, built and operated by Planet Labs Inc., and will enable imagery of the changing planet to be taken on a frequent …

    Read Full Post

    ISS Daily Summary Report – 09/14/2016

    Asia Try Zero-G: The crew performed the ASIA TRY ZERO-G experiment.  The crew performed science experiments on themes proposed by six different countries throughout Asia.  The downlinked video will be used to promote the understanding of space activity for Asian countries. Electrostatic Levitation Furnace (ELF) Troubleshooting: The crew is troubleshooting the ELF facility.  The crew …

    Read Full Post

    ISS Daily Summary Report – 09/13/2016

    NanoRack Cubesat Deployer (NRCSD) #9 Install: After extending the JEM Airlock (JEMAL) slide table into the cabin, FE-5 installed the NRCSD #9 quad-deployer onto the Multi-Purpose Experiment Platform Small Fine Arm Attachment Mechanism (MPEP/SAM) attachments this morning. The crew then retracted the slide table, closed the JEMAL hatch and depressurized the JEMAL in advance of …

    Read Full Post

Subscribe to this blog

Show Past Archives