Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 10/11/2016

    Human Research Facility (HRF) Ultrasound Status: Over the weekend ground teams and the crew were able to successfully troubleshoot the data files on the HRF Ultrasound and to upgrade the backup unit.  The data files for the CDR were downlinked and evaluated by specialists, and a repeat of the Fluid Shifts Baseline Imaging is not …

    Read Full Post

    ISS Daily Summary Report – 10/07/2016

    Synchronized Position Hold, Engage, Reorient, Experimental Satellites (SPHERES)-Slosh: FE-6 configured the SPHERES-Slosh experiment setup using two SPHEREs satellites and the slosh assembly. With ground team support, the crew executed off of the predetermined test matrix.  The SPHERES-Slosh investigation examines the way liquids move inside containers in a microgravity environment. The phenomena and mechanics associated with …

    Read Full Post

    ISS Daily Summary Report – 10/06/2016

    Fluid Shifts Before, During and After Prolonged Space Flight and Their Association with Intracranial Pressure and Visual Impairment (Fluid Shifts): Following yesterday’s Dilution Measurements, today, the ISS CDR performed Day 2 of his Final Fluid Shifts collection.  With assistance from FE-6, the crew performed various collections and measurements including Optical Coherence Tomography (OCT), Distortion Product …

    Read Full Post

    ISS Daily Summary Report – 10/05/2016

    ENERGY (Astronaut’s Energy Requirement for Long-Term Space Flight): Today, FE-5 completed Day 7 of the 11 day ENERGY experiment. In addition to today’s water and urine samples, the 11 day ENERGY experiment requires FE-5 to continue logging his dietary intake and wear the armband that monitors his activities. The Energy investigation measures an Astronaut’s Energy …

    Read Full Post

    ISS Daily Summary Report – 10/04/2016

    ENERGY (Astronaut’s Energy Requirement for Long-Term Space Flight): Today, FE-5 completed Day 6 of the 11 day ENERGY experiment. As part of today’s activities, he continued logging his dietary intake and wearing the armband that monitors his activities.  The Energy investigation measures an Astronaut’s Energy Requirements for Long-Term Space Flight, a crucial factor needed for …

    Read Full Post

    ISS Daily Summary Report – 10/03/2016

    Sally Ride Earth Knowledge Acquired by Middle Schools (EarthKam) Set Up: ISS CDR set up the Sally Ride EarthKam equipment in the Node 2 window which begins a week-long imaging session. The objective of Sally Ride EarthKam is to integrate Earth images with inquiry-based learning to enhance curricula in support of national and state education …

    Read Full Post

    ISS Daily Summary Report – 09/30/2016

    ENERGY (Astronaut’s Energy Requirement for Long-Term Space Flight): Today, FE-5 continued with Day 2 of the 11 day ENERGY experiment. The second day activities include the consumption of a standardized breakfast, continued diet logging, continued wear of the Armband Activity Monitor, double labeled water intake, oxygen uptake measurements, and urine collection. FE-6, as the control …

    Read Full Post

    ISS Daily Summary Report – 09/29/2016

    Group Combustion Module (GCM) Installation: FE-5 continued with the third day of installation and preparation for the GCM experiment and was to perform two pressure decay leak checks. After the first check, a leak was detected in the Air/O2 line, thus aborting the second check until specialist can determine the cause and develop a solution. …

    Read Full Post

    ISS Daily Summary Report – 09/28/2016

    Marangoni Experiment (Dynamic Surf 3): Overnight another run of the Marangoni experiment occurred in the Fluid Physics Experiment Facility (FPEF). The Dynamic Surf investigation is part of a series of JAXA experiments studying Marangoni convection driven by the presence of surface tension gradients produced by a temperature difference at a liquid/gas interface. By observing and …

    Read Full Post

    ISS Daily Summary Report – 09/27/2016

    Group Combustion Module (GCM) Installation:  Today, FE-5 with the assistance of FE-6, started the first of two days of installation and preparation for the GCM experiment.  The crew began with assembly of the GCM attaching cameras and the Fuel Supply Syringe.  Following GCM setup, the crew then began configuration of the Combustion Chamber attaching the …

    Read Full Post

Subscribe to this blog

Show Past Archives