Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 10/24/2016

    Bigelow Expandable Activity Module (BEAM) Ingress and Sampling: FE-6 stowed the Advanced Resistive Exercise Device (ARED) then opened Node3 Aft hatch to ingress the BEAM.  Once inside, the crew collected Microbial Air Sampler (MAS) and Surface Sample Kit (SSK) microbial and surface samples and deployed the Radiation Area Monitors (RAMs) delivered on 48Soyuz (48S).  The …

    Read Full Post

    ISS Daily Summary Report – 10/23/2016

    Cygnus Rendezvous and Capture:  This morning the crew monitored the Cygnus approach from the Cupola Robotic Workstation and successfully captured Cygnus using the Space Station Remote Manipulator System (SSRMS) at 6:28 am CDT.  The Ground Robotics team maneuvered Cygnus into position to inspect the Passive Common Berthing Mechanism (CBM), and berthed Cygnus onto the Node-1 …

    Read Full Post

    ISS Daily Summary Report – 10/21/2016

    48 Soyuz (48S) Dock: 48S launched from the Baikonur Cosmodrome on Wednesday, October 19th, and docked to the ISS this morning bringing Ryzhikov, Borisenko, and Kimbrough to the ISS. Docking to the Mini Research Module-2 (MRM-2) module was completed at 4:53 am CDT with hatch opening at 7:20 am CDT. Today’s docking increases the ISS …

    Read Full Post

    ISS Daily Summary Report – 10/20/2016

    Group Combustion Troubleshooting: FE-5 resumed the troubleshooting on the Group Combustion Experiment Module (GCEM).  The crew removed the GCEM Combustion Chamber Element (CCE) from the Multi-Purpose Small Payload Rack (MSPR) rack and installed it on the Work Bench to verify the air supply line Quick Disconnect (QD) connections.  FE-5 then reinstalled the Combustion Chamber and …

    Read Full Post

    ISS Daily Summary Report – 10/19/2016

    Soyuz 48S Launch:  48S launched from the Baikonur Cosmodrome at GMT 293/08:05:14.378, carrying Expedition 49 crewmembers Shane Kimbrough, Andrei Borisenko, and Sergey Ryzhikov to the ISS.  Vehicle experienced a nominal ascent and all solar arrays and antennas successfully deployed. The Soyuz will perform a 34-orbit rendezvous before docking with the ISS on Friday, October 21 …

    Read Full Post

    ISS Daily Summary Report – 10/18/2016

    Orbital ATK (OA)-5 Launch:  The Cygnus spacecraft successfully launched from Wallops Island, Virginia atop an Antares rocket on Monday at 6:45pm CDT. The spacecraft will loiter until after 48S docking, scheduled for Friday, October 21st. Cygnus approach, capture, and berthing will occur on Sunday, 23-October. Cygnus will be delivering approximately 2,400 kg of pressurized cargo …

    Read Full Post

    ISS Daily Summary Report – 10/17/2016

    Cygnus Launch Status:  Yesterday’s planned launch of the OA-5 mission was postponed for 24 hours due to an issue with a ground support equipment.  OA-5 launch is set for today, 17-October at 6:40 PM CDT.  This launch attempt will result in OA loitering until after 48S docking, scheduled for Friday 21-October.  OA-5 approach and berthing …

    Read Full Post

    ISS Daily Summary Report – 10/14/2016

    63 Progress (63P) Undock: 63P undocked successfully from the Service Module (SM) aft port this morning at 4:37 AM CDT. Deorbit burn was completed at 7:50 AM CDT followed by atmospheric entry and destruction.  Vascular Echo Resting Ultrasound: FE-5 performed Vascular Echo resting ultrasound and blood pressure measurements this morning.  With assistance from ground remote …

    Read Full Post

    ISS Daily Summary Report – 10/13/2016

    Cardio Ox Ultrasound Operations: With remote guidance from the Cardio Ox ground teams, FE-5 assisted FE-6 in conducting an ultrasound scan after configuring the Voice-Activated Communication (VOX), attaching the Electrocardiograms (ECG) Electrodes, and marking the arteries; followed by blood pressure measurements using the Cardiolab Holter Arterial Blood Pressure Unit. The goal of the Cardio Ox …

    Read Full Post

    ISS Daily Summary Report – 10/12/2016

    Fluid Shifts Before, During and After Prolonged Space Flight and Their Association with Intracranial Pressure and Visual Impairment (Fluid Shifts): Following yesterday’s Dilution Measurements, today, FE-5 performed Day 2 of his final Fluid Shifts collection.  With assistance from FE-6, the crew performed various collections and measurements including Optical Coherence Tomography (OCT), Distortion Product Otoacoustic Emissions …

    Read Full Post

Subscribe to this blog

Show Past Archives