Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 11/08/2016

    Veg-03 Operations: The crew checked and photo documented the status of the plants in the Veggie facility, and evaluated the plant pillows to determine if additional watering is required.  The overall goal of Veg-03 is to further demonstrate proof-of concept for the Veggie plant growth chamber and the planting pillows using ‘Outredgeous’ Red Romaine lettuce.  …

    Read Full Post

    ISS Daily Summary Report – 11/07/2016

    Sally Ride Earth Knowledge Acquired by Middle Schools (EarthKAM): The crew configured the camera, laptop and associated Sally Ride EarthKAM software at the Node 2 Nadir hatch window. Once configured, the EarthKAM team, in association with middle school students around the world, selected image targets which will be downlinked and used in the study of …

    Read Full Post

    ISS Daily Summary Report – 11/04/2016

    Human Research Program (HRP) Collections: The crew continued a urine collection session today and performed the first blood draw in support of the Biochemical Profile and Repository experiments. Collected samples are placed in Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI) for return at a later date. The Biochemical Profile experiment tests blood and …

    Read Full Post

    ISS Daily Summary Report – 11/03/2016

    Orbital ATK (OA)-5 Cargo Operations:  Today, CDR continued transferring cargo from Cygnus to ISS. Afterwards, CDR participated in a cargo conference with ground specialists. At last report approximately 9.5 hours of cargo operations had been completed and an estimated 16 hours of operations remaining.  Human Research Program (HRP) Collections: CDR began 24-hour urine collections this …

    Read Full Post

    ISS Daily Summary Report – 11/02/2016

    Group Combustion Leak Check: CDR retrieved the Combustion Chamber from the Multi-Purpose Small Payload Rack (MSPR) Work Volume and installed a top plate on the Combustion Chamber.  The crew then installed a gas bottles and air supply lines to configure for a leak check.  Ground specialists are focusing the leak check on the Group Combustion …

    Read Full Post

    ISS Daily Summary Report – 11/01/2016

    Extravehicular Mobility Unit (EMU) Maintenance:  The crew performed a half water dump and fill on EMU 3006 feedwater tanks and a full water dump and refill of EMUs 3003 and 3010 feeedwater tanks. These activities satisfy maintenance requirements for on-orbit stowage of the EMUs.  Urine Processing Assembly (UPA):  Last week, the crew demated the connection …

    Read Full Post

    ISS Daily Summary Report – 10/28/2016

    Veg-03 Wick Opening: FE-3 opened the wicks on the plant pillows to allow for better growth capability.  The overall goal of Veg-03 is to further demonstrate proof-of concept for the Veggie plant growth chamber and the planting pillows. Future long-duration missions into the solar system, finally culminating on Mars, will require a fresh food supply …

    Read Full Post

    ISS Daily Summary Report – 10/27/2016

    Cygnus Cargo Operations:  The crew was originally scheduled to ingress the Cygnus vehicle this morning, however the crew got ahead of the timeline and ingressed on Sunday, October 23rd.  Today the crew performed Cygnus cargo transfer operations off the tasklist during the time that was allocated for ingress. Airway Monitory Reconfiguration: Following Tuesday’s successful Airway …

    Read Full Post

    ISS Daily Summary Report – 10/26/2016

    Meteor Operations: FE-6 exchanged the hard drive then removed and replaced the grating in the Meteor Camera located in the Window Observational Research Facility (WORF). The Meteor payload is a visible spectroscopy instrument with the primary purpose of observing meteors in Earth orbit. Meteor uses image analysis to provide information on the physical and chemical …

    Read Full Post

    ISS Daily Summary Report – 10/25/2016

    Veg-03 Initiation: FE-3 configured and installed the Vegetable Production System (Veggie) on the Maintenance Work Area (MWA) and then installed six Small Plant Pillows to hold the ‘Outredgeous’ red romaine lettuce plants.  Ground teams plan to grow the lettuce plants for two months, with four harvests planned.  The overall goal of Veg-03 is to further …

    Read Full Post

Subscribe to this blog

Show Past Archives