Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 5/11/2017

    OsteoOmics: The crew changed BioCell media in BioCell Habitat 4. The media in all four of the habitats are changed in this second of four weeks of OsteoOmics operations.  Crewmembers experience bone loss in orbit, stemming from the lack of gravity acting on their bones. OsteoOmics investigates the molecular mechanisms that dictate this bone loss …

    Read Full Post

    ISS Daily Summary Report – 5/10/2017

    OsteoOmics: The crew changed BioCell media in BioCell Habitat 3. The media in all four of the habitats will be changed in this second of four weeks of OsteoOmics operations.  Crewmembers experience bone loss in orbit, stemming from the lack of gravity acting on their bones. OsteoOmics investigates the molecular mechanisms that dictate this bone …

    Read Full Post

    ISS Daily Summary Report – 5/09/2017

    OsteoOmics: The crew changed BioCell media in BioCell Habitat 2. The media in the other four habitats will be changed this week. This is the second of four weeks of OsteoOmics operations. Crewmembers experience bone loss in orbit, stemming from the lack of gravity acting on their bones. OsteoOmics investigates the molecular mechanisms that dictate …

    Read Full Post

    ISS Daily Summary Report – 5/08/2017

    Main Bus Switching Unit (MBSU) 2 Remove & Replace (R&R):  Friday evening and into Saturday, Robotics Ground Controllers maneuvered the Special Purpose Dexterous Manipulator (SPDM) Arms and successfully removed the failed MBSU 2 and replaced it with a spare. The failed MBSU was then installed onto External Stowage Platform (ESP)-2.  After a successful power up …

    Read Full Post

    ISS Daily Summary Report – 5/05/2017

    Main Bus Switching Unit (MBSU)2 Robotic Remove & Replace (R&R): Last night, Robotics ground teams completed the extraction of the spare MBSU Flight Releasable Attachment Mechanism (FRAM) from External Stowage Platform 2 (ESP-2) and successfully relocated it on the Special Purpose Dexterous Manipulator (SPDM) Enhanced ORU Temporary Platform (EOTP).  Then, the SPDM was used to …

    Read Full Post

    ISS Daily Summary Report – 5/04/2017

    OsteoOmics: The crew thawed BioCells and injected them into growth media inside the Microgravity Science Glovebox (MSG). After six BioCells were processed they were placed into BioCell Habitat 3, which was then placed in the Space Automated Bioproduct Lab (SABL).  Later in the day the crew removed a media kit from a Microgravity Experiment Research …

    Read Full Post

    ISS Daily Summary Report – 5/03/2017

    OsteoOmics:  The crew thawed BioCells and injected them into growth media inside the Microgravity Science Glovebox (MSG). After all six BioCells are processed were placed into BioCell Habitat 2 which is then placed in the Space Automated Bioproduct Lab (SABL).  Later in the day the crew removed a media kit from a Microgravity Experiment Research …

    Read Full Post

    ISS Daily Summary Report – 5/02/2017

    OsteoOmics:  The crew thawed a BioCell and injected it into growth media in the Microgravity Science Glovebox (MSG). After all six BioCells are processed they are put in BioCell Habitat 1 which is placed in the Space Automated Bioproduct Lab (SABL).  Beginning with the media injection, subsequent BioCell operations are performed inside the MSG.  Later …

    Read Full Post

    ISS Daily Summary Report – 5/01/2017

    OsteoOmics Investigation:  In preparation for OsteoOmic investigation activities planned this week, the crew configured OsteoOmics hardware and the Microgravity Science Glovebox (MSG), reviewed procedures, conferred with ground experts and completed an OsteoOmics practice session.  Samples were retrieved from Minus Eighty Laboratory Freezer for ISS (MELFI) and General Laboratory Active Cryogenic ISS Experiment Refrigerator (GLACIER) for …

    Read Full Post

    ISS Daily Summary Report – 4/28/2017

    NanoRacks External Platform (NREP) Installation:  The JEM (Japanese Experiment Module) Remote Manipulator System (JEMRMS) transferred and installed the NREP to the JEM External Facility (JEM-EF).  The Slide Table was returned to the JEM Airlock (JEMAL) and the crew pressurized and vented the Airlock in preparation for future JEMAL activities.  NREP represents the first external commercial …

    Read Full Post

Subscribe to this blog

Show Past Archives