Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 6/22/2017

    Rodent Research-5 (RR-5) Systemic Therapy of NELL-1 for Osteoporosis:  The crew completed injections of the mice in the Microgravity Science Glovebox (MSG) for the RR-5 investigation. Spaceflight has significant and rapid effects on the musculoskeletal system; therefore, it is important to investigate targeted therapies that could ameliorate some of the detrimental effects of spaceflight. The …

    Read Full Post

    ISS Daily Summary Report – 6/21/2017

    Rodent Research-5 (RR-5) Systemic Therapy of NELL-1 for Osteoporosis:  The crew set up and checked out the spare Rodent Habitat which replaces Rodent Habitat 2 that has excessive condensation in its water box.  Later the crew will perform injections of the mice in the Microgravity Science Glovebox (MSG).  Spaceflight has significant and rapid effects on …

    Read Full Post

    ISS Daily Summary Report – 6/20/2017

    Bigelow Expandable Activity Module (BEAM):  The crew ingressed BEAM and replaced a 3.3 mm thick Radiation Environment Monitor (REM) shield that was installed onto a REM sensor on May 31, 2017 with a 10.0 mm thick shield that was also printed on the 3D printer onboard the ISS.  BEAM is an experimental expandable module attached …

    Read Full Post

    ISS Daily Summary Report – 6/19/2017

    Roll Out Solar Array (ROSA) External Payload: Over the weekend, Robotic ground controllers maneuvered the Space Station Remote Manipulator System (SSRMS) and the Special Purpose Dexterous Manipulator (SPDM) to remove the ROSA payload from the Dragon Trunk and position it at the ROSA Nominal Dynamics Operations position. When at this position, the controllers mated the …

    Read Full Post

    ISS Daily Summary Report – 6/16/2017

    67 Progress (67P) Docking: 67P rendezvous and docking to ISS Service Module (SM) aft port was completed successfully today at 6:37 am CDT.  Following hatch opening the crew began transferring early unstow items. Japanese Small Satellite Orbital Deployer (J-SSOD): The crew brought the JEM Airlock Slide Table (ST) into the ISS and mounted the J-SSOD …

    Read Full Post

    ISS Daily Summary Report – 6/15/2017

    Neutron Star Interior Composition ExploreR (NICER) Status: Yesterday’s planned NICER deployment was not completed due to  a problem with releasing all four of the NICER launch locks. Following several attempts, the NICER team successfully released three of the four launch locks. The team continues attempts to release the fourth lock.  NanoRacks Module-52:  The crew performed …

    Read Full Post

    ISS Daily Summary Report – 6/14/2017

    67 Progress Launch: 67P launched successfully from Baikonur, Kazakhstan today at 4:20am CDT followed by a nominal ascent and orbit insertion.  All systems are performing nominally.  Docking is scheduled for Friday, June 16 at 6:42am CDT.  Rodent Research-5 (RR-5) Systemic Therapy of NELL-1 for Osteoporosis: The crew restocked two of the four Animal Habitats and …

    Read Full Post

    ISS Daily Summary Report – 6/13/2017

    Electrostatic Levitation Furnace (ELF): The crew replaced the Sample Cartridge and the stuck Sample Holder in the ELF with a new type of Sample Holder and a Sample Cartridge.  The ELF is an experimental facility designed to levitate, melt and solidify materials by containerless processing techniques using the Electrostatic Levitation method. With this facility, thermophysical …

    Read Full Post

    ISS Daily Summary Report – 6/12/2017

    Rodent Research-5 (RR-5) Systemic Therapy of NELL-1 for Osteoporosis:  On Saturday two crewmembers performed the second injection of the RR-5 mice in the Microgravity Science Glovebox (MSG).  Spaceflight has significant and rapid effects on the musculoskeletal system; therefore, it is important to investigate targeted therapies that could ameliorate some of the detrimental effects of spaceflight. …

    Read Full Post

    ISS Daily Summary Report – 6/09/2017

    Rodent Research-5 (RR-5) Systemic Therapy of NELL-1 for Osteoporosis:  Two crewmembers performed the first injection of the RR-5 mice in the Microgravity Science Glovebox (MSG).  Spaceflight has significant and rapid effects on the musculoskeletal system, therefore, it is important to investigate targeted therapies that could ameliorate some of the detrimental effects of spaceflight. The NELL-1 …

    Read Full Post

Subscribe to this blog

Show Past Archives