Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 12/07/2017

    Electrostatic Levitation Furnace (ELF) Sample Operations: The crew retrieved and cleaned the ELF sample cartridge and then transferred three samples from one set of sample holders to another set of holders. ELF is an experimental facility designed to levitate, melt and solidify materials by container less processing techniques using the electrostatic levitation method. With this …

    Read Full Post

    ISS Daily Summary Report – 12/06/2017

    OA-8 Cygnus Release:  After yesterday’s unberth and the overnight GPS shadowing (“Photobomb”) Detailed Test Objective (DTO), today SSRMS ground controllers relocated the Cygnus vehicle to the release point and the onboard crew released the vehicle and monitored its departure.  Cygnus will be held in that position overnight and then repositioned for release tomorrow.  Cygnus arrived …

    Read Full Post

    ISS Daily Summary Report – 12/05/2017

    Cygnus unberth:  This morning, the crew egressed Cygnus.  They then configured the vestibule and prepared to depressurize the vestibule.  Ground teams identified EMI as the cause of the pressure probe anomaly and successfully depressurized the vestibule.  Later, the Cygnus vehicle was unberthed and positioned it for the GPS shadowing (“photobomb”) Developmental Test Objective (DTO).  Cygnus …

    Read Full Post

    ISS Daily Summary Report – 12/04/2017

    Earth Imagery from ISS Target Operations: Over the weekend, the crew captured images and video footage of Japan, the Sahara Desert, the India-Himalayas-Tibetan Plateau, Seattle and the Pacific Northwest, and Ireland to Moscow at night. Today the crew captured images of the Himalayas, facing northwest up the mountain range. The Earth Imagery from ISS investigation …

    Read Full Post

    ISS Daily Summary Report – 12/01/2017

    Circadian Rhythms: A 52S crewmember removed and stowed the Double Sensors and Thermolab Unit equipment that was used to complete a 36-hour Circadian Rhythms session that began on Wednesday. Circadian Rhythms investigates the role of synchronized circadian rhythms, or the “biological clock,” and how it changes during long-duration spaceflight. Researchers hypothesize that a non-24-hour cycle …

    Read Full Post

    ISS Daily Summary Report – 11/30/2017

    Probiotics Operations: Today a crewmember conducted the second half of the third sampling phase for the JAXA Probiotic investigation that began on GMT 331 with fecal sample collections. Today’s activities included saliva sample collections and a questionnaire. Some species of harmful bacteria such as Salmonella grow stronger and more virulent in the microgravity environment of …

    Read Full Post

    ISS Daily Summary Report – 11/29/2017

    Rodent Research 6 (RR-6):  During the installation of four Rodent Habitats yesterday, the crew noticed a leak on the outside of the first two habitats. The crew successfully installed the third and fourth habitats, but were instructed to temporarily stow the first two habitats until ground teams could develop a forward plan.  Earlier today, the …

    Read Full Post

    ISS Daily Summary Report – 11/28/2017

    Sabatier Removal for Return:  In preparation for returning Sabatier, today the crew completed the first of two days of activities by removing the Sabatier unit from the Oxygen Generation System (OGS) Rack.  They also completed some near term preventive maintenance activities by performing an H2 Sensor Removal and Replacement (R&R) and Avionics Air Assembly (AAA) …

    Read Full Post

    ISS Daily Summary Report – 11/27/2017

    Earth Imagery from ISS Target Operations: Over the weekend, the crew captured images and video footage of the Australian Desert, Italy at night, Seattle and the Pacific Northwest, and Ireland to Moscow at night. The Earth Imagery from ISS investigation creates a series of videos, displaying Earth from space. These videos will be taken with …

    Read Full Post

    ISS Daily Summary Report – 11/23/2017

    Cygnus Cargo Operations:  The crew completed 12 hours and 45 minutes of Cygnus cargo operations today, at this time the crew has completed 84% of the cargo operations for this Cygnus mission.  Ground specialist estimate the crew will require approximately 8 hours to complete the remaining cargo operations.   Sarcolab-3: After successfully completing three days of …

    Read Full Post

Subscribe to this blog

Show Past Archives