Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 6/14/2018

    USOS Extravehicular Activity (EVA) #51: Today Ricky Arnold (EV-1) and Drew Feustel (EV-2) completed US EVA #51 Node 2 (N2) Forward External Wireless Communications (EWC) with a Phased Elapsed Time (PET) of 6h 49m. Today’s EVA tasks included: Routing EWC power and Ethernet cables between the US Lab and N2. Installing Worksite Interface (WIF) #16 …

    Read Full Post

    ISS Daily Summary Report – 6/13/2018

    Extravehicular Activity (EVA) Preparations: In preparation for tomorrow’s US EVA #51 Node 2 External Wireless Communications (EWC), the crew finalized their EVA tool configurations and completed an audit of EVA equipment.  After a final review of the EVA briefing package, the crew participated in an EVA Procedures Conference, configured the Robotics Work Stations (RWSs), and readied …

    Read Full Post

    ISS Daily Summary Report – 6/12/2018

    Solidification Using Baffles in Sealed Ampoules (SUBSA):  Today, the crew troubleshot the SUBSA experiment that is currently located in the Microgravity Science Glovebox (MSG). The crew removed the sample ampoule, which was lodged inside the chamber bore. Additional troubleshooting is being discussed among the ground teams. The objective of the SUBSA investigation is to advance …

    Read Full Post

    ISS Daily Summary Report – 6/11/2018

    Grip:  Today a crewmember deployed Grip hardware in the Columbus module central aisle and performed dynamic seated operations.  ESA’s Grip investigation tests how the nervous system takes into account the forces due to gravity and inertia when manipulating objects. Results from this investigation may provide insight into potential hazards for astronauts as they manipulate objects …

    Read Full Post

    ISS Daily Summary Report – 6/08/2018

    Soyuz 55S Docking: The 55S vehicle completed a nominal docking to the ISS at 8:01 CDT (13:01 GMT).  The 55S Crew, Sergey Prokopev, Alexander Gerst and Serena Auñón-Chancellor, returned ISS to 6-crew operations after hatch opening at 10:18 CDT (15:18 GMT).  Late this afternoon, the entire ISS crew conducted a Safety Briefing to familiarize the …

    Read Full Post

    ISS Daily Summary Report – 6/07/2018

    Soyuz 55S status:  55S successfully launched yesterday at 11:12:39 GMT.  The vehicle is progressing toward a nominal docking to the ISS tomorrow at 8:07 CDT (13:07 GMT).  Food Acceptability:  A crewmember completed a Food Acceptability questionnaire today. The Food Acceptability investigation seeks to determine the impact of repetitive consumption of food currently available from the …

    Read Full Post

    ISS Daily Summary Report – 6/06/2018

    55Soyuz (55S) Launch: 55S launched from the Baikonur Cosmodrome this morning at 6:12 AM CT with Sergy Prokopev, Serena Auñón-Chancellor, and Alexander Gerst on-board.  Docking to the Mini Research Module-1 (MRM-1) module is scheduled at 08:07 AM CT on June 8 after a 34-orbit rendezvous. The ISS crew compliment will increase to six after hatch opening …

    Read Full Post

    ISS Daily Summary Report – 6/05/2018

    Electro-static Levitation Furnace (ELF):  Today the crew exchanged the sample holders to prepare for upcoming ground commanded operations in the ELF.  ELF is an experimental facility designed to levitate, melt and solidify materials by containerless processing techniques using the electrostatic levitation method.  With this facility thermophysical properties of high temperature melts can be measured and …

    Read Full Post

    ISS Daily Summary Report – 6/04/2018

    Atomization:  The crew swapped sample syringes for the Atomization investigation today. The Atomization experiment investigates the disintegration processes of a low-speed water jet for various jet issue conditions in the Japanese Experiment Module (JEM) to validate the new atomization concept by observing the process using a high speed camera. The knowledge gained can be applied …

    Read Full Post

    ISS Daily Summary Report – 6/01/2018

    EXPRESS Rack-3 Improved Payload Ethernet Hub Gateway (iPEHG) and Veggie:  The crew rotated EXPRESS Rack 3 down in the Columbus module today, installed an iPEHG and then rotated the rack back up.  They then reinstalled the Veggie facilities into the rack and checked them out.  Ground teams have activated EXPRESS Rack 3 and the iPEHG …

    Read Full Post

Subscribe to this blog

Show Past Archives