Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

    ISS Daily Summary Report – 11/05/2018

    Plant Habitat: Today, the crew wrapped plant samples into foil packs and placed them into Minus Eighty Laboratory Freezer for ISS (MELFI)-3 and the Plant Habitat facility was cleaned. Plant Habitat is a fully automated facility conducting plant bioscience research on the ISS. The space environment is stressful for all living organisms. Understanding how plants …

    Read Full Post

    ISS Daily Summary Report – 11/02/2018

    Advanced Colloids Experiment-Temperature-7 (ACE-T7) Sample Configuration:  The crew configured LMM (Light Microscopy Module) for the ACE-T-7 science run.  The ACE-T-7 module was processed prior to this increment, and this run will allow investigators to observe the structures following longer-term evolution.  The experiment involves the design and assembly of complex three-dimensional structures from small particles suspended …

    Read Full Post

    ISS Daily Summary Report – 11/01/2018

    Combustion Integration Rack (CIR) Burst Disc Removal: The crew removed the burst discs from the argon and checked gas manifolds in the CIR Gas Chromatography (GC) system.  These burst discs are considered redundant with the pressure relief valves in the system and issues with the helium burst disc have occurred in the past.  Following this …

    Read Full Post

    ISS Daily Summary Report – 10/31/2018

    Combustion Integration Rack (CIR) Manifold Bottle Replacement: In support of part 2 of the CIR / Advanced Combustion via Microgravity Experiments (ACME) / Electric-Field Effects on Laminar Diffusion (E-FIELD) Flames operations, the crew removed the 30% ethylene, 70% nitrogen fuel bottle and replaced it with a 100% methane fuel bottle today.  For E-Field Flames, an …

    Read Full Post

    ISS Daily Summary Report – 10/30/2018

    Binary Colloidal Alloy Test – Cohesive Sediment (BCAT-CS):  Today, the crew transferred images to the Station Support Computer (SSC), replaced the SB-800 Flash batteries, verified the camera alignment and focus are still intact, and re-set the intervalometer.  BCAT-CS continues to produce interesting data resulting in an extension past the original 2-4 week run duration.  BCAT-CS …

    Read Full Post

    ISS Daily Summary Report – 10/29/2018

    Actiwatch Spectrum:  Following the discovery of some bad data from a previous Actiwatch spectrum data collection, this activity set up the nine remaining Actiwatch spectrum units to verify they are producing good data. The Actiwatch Spectrum is a waterproof, nonintrusive, sleep-wake monitor worn on a crewmember’s wrist. The device contains an accelerometer for measuring motion …

    Read Full Post

    ISS Daily Summary Report – 10/26/2018

    Echo External Hard Disk Connection: The crew connected the Echo External Hard Disk and USB Cable to SSC 11 in preparation for a file update and subsequent Echo software update.  The purpose of the investigation is to evaluate a tele-operated ultrasound system equipped with motorized probes that are controlled by ground controllers. Additionally, this investigation …

    Read Full Post

    ISS Daily Summary Report – 10/25/2018

    Veg-03G:  Today, the crew installed a Root Mat and Plant Pillows, then powered up Veg-03G and set light intervals.  They then filled the Plant Pillows and Root Mat with water in order to initiate the Veg-03G experiment.  This is the first day of a 28 day growth cycle for the Red Russian Kale and Dragoon …

    Read Full Post

    ISS Daily Summary Report – 10/24/2018

    Fluids Integrated Rack (FIR) / Light Microscopy Module (LMM) / Biophysics-4:  Following an overall successful conclusion of the Biophysics-4 experiment run, the Biophysics-4 plate was removed from the LMM and stowed.  The Biophysics-4 experiment contained proteins with both a fast and slow evolutionary period, which were observed by the ground teams.  Proteins are important biological …

    Read Full Post

    ISS Daily Summary Report – 10/23/2018

    Multi-purpose Small Payload Rack (MSPR) DC / DC Converter Unit (DCU) Replacement Part 1:  The crew replaced MSPR DCU with and upgraded DCU2. The still functional older unit will be kept onboard as a spare. The MSPR is a multipurpose payload rack system used in the JEM. It has two workspaces and a work table …

    Read Full Post

Subscribe to this blog

Show Past Archives