Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from March 25th 2021

View All Posts

    ISS Daily Summary Report – 3/25/2021

    Payloads Airborne Particulate Monitor (APM): The crew installed the APM hardware in Node 2. Air quality in crewed spacecraft is important for keeping astronauts healthy and comfortable. Although requirements exist for maximum allowable concentrations of particulate matter, currently no measurement capability verifies whether these requirements are met. The Airborne Particulate Monitor (APM) demonstrates an instrument …

    Read Full Post