Group Combustion Module (GCM) Installation: FE-5 continued with the third day of installation and preparation for the GCM experiment and was to perform two pressure decay leak checks. After the first check, a leak was detected in the Air/O2 line, thus aborting the second check until specialist can determine the cause and develop a solution. …






