Suggested Searches

Blogs

    SpaceX Dragon Targets Mid-July Launch

    SpaceX and NASA managers are targeting July 16 for the launch of the ninth Dragon commercial resupply mission to the International Space Station. Meanwhile, U.S. and Russian spaceships are being packed for upcoming departures in June and July from the orbital lab. The crew also began preparing the vestibule space between BEAM – the Bigelow …

    Read Full Post

    Fact Sheet Highlights New VAB Work Platforms for SLS

    Artist's concept depicting work platforms inside VAB High Bay 3

    New work platforms being installed in Kennedy Space Center’s Vehicle Assembly Building will provide access for testing and processing NASA’s Space Launch System (SLS) rocket. The rocket will launch an uncrewed Orion spacecraft on Exploration Mission 1 (EM-1) from Launch Pad 39B at the agency’s Kennedy Space Center in Florida. SLS will be capable of …

    Read Full Post

    ISS Daily Summary Report – 05/23/16

    Marrow: Upon waking this morning, the crew took breath and ambient air samples for the Canadian Space Agency (CSA) Marrow experiment which investigates the effect of microgravity on human bone marrow. It is believed that microgravity, like long-duration bed rest on Earth, has a negative effect on bone marrow and the blood cells that are …

    Read Full Post

    Station Gets Ready for BEAM Expansion

    Bigelow Expandable Activity Module

    The Expedition 47 crew is getting a new module recently attached to the Tranquility module ready for expansion later this week. The International Space Station residents are also running experiments today exploring a wide variety of phenomena and checking station gear. BEAM, or the Bigelow Expandable Activity Module, is scheduled to expand to full pressurized …

    Read Full Post

    ISS Daily Summary Report – 05/20/16

    Rodent Research-3 (RR-3) Operations: The crew completed operations on 5 more rodents, performing bone densitometry measurements, then transferring the rodents to the Microgravity Science Glovebox (MSG) for sample processing.  Today’s operations conclude this session of RR activities. The next activities are tentatively planned following SpaceX-10 arrival. This investigation studies the molecular and physical changes to …

    Read Full Post

    ISS Daily Summary Report – 05/19/16

    Rodent Research-3 (RR-3) Operations: The crew has completed operations on 15 rodents. They are scheduled to perform operations on 5 rodents today and 5 more tomorrow which will conclude this session of RR activities.  The crew will perform bone densitometry measurements and then transfer the rodents to the Microgravity Science Glovebox (MSG) for sample processing. …

    Read Full Post

    Crew Researching How Life Adapts to Spaceflight

    CubeSats

    The crew was back at work today with more life science studies and human research. Cygnus cargo transfer work is ongoing as robotics controllers prepare for an external video survey. Mice continue to be observed today for the Rodent Research-3 study. The astronauts are measuring their bone density to learn how microgravity affects muscles and …

    Read Full Post

    ISS Daily Summary Report – 05/18/16

    Japanese Experiment Module (JEM) Airlock (JEMAL) NanoRacks Cubesat Deployer #7 (NRCSD 7) Deployment: This morning, operations which began Monday were completed with the deployment of four Dove satellites and four LEMUR-2 satellites.  All satellites were deployed on time as commanded.  The empty deployer will be returned to the JEM Airlock.   Rodent Research-3 (RR-3) Operations: …

    Read Full Post

    Last Cubesats Released as Life Science Continues

    Cubesats Released

    The final set of Cubesats was ejected from the International Space Station today. Inside the orbital lab, the station residents continued more rodent bone and muscle research, checked for microbes and cleaned fans. A total of 17 Cubesats have been released since Monday from a small satellite deployer on the outside of the Kibo experiment …

    Read Full Post

    ISS Daily Summary Report – 05/17/16

    Japanese Experiment Module (JEM) Airlock (JEMAL) NanoRacks CubeSat Deployer #7 (NRCSD 7) Deployment Operations: Today a total of 6 Dove satellites will be deployed via ground commanding. This morning the NRCSD 7 Silos 1 and 2 were deployed and Silo 3 is planned to be deployed this evening during crew sleep. This will complete the …

    Read Full Post