Suggested Searches

Blogs

    NASA TV BEAM Coverage on Break

    Bigelow Expandable Activity Module

    NASA Astronaut Jeff Williams has continued to add air to the Bigelow Expandable Activity Module (BEAM) in a series of short bursts during operations aboard the International Space Station today. A total of 44 seconds of air has been introduced during eight bursts. Flight controllers are monitoring the operation as the module slowly expands. BEAM …

    Read Full Post

    BEAM Operations Resuming

    NASA Astronaut Jeff Williams

    NASA and Bigelow Aerospace are resuming operations to expand the Bigelow Expandable Activity Module (BEAM), currently attached to the International Space Station. NASA Television coverage is again underway and can be seen at https://www.nasa.gov/nasatv During operations this morning, NASA Astronaut Jeff Williams introduced four pulses of air into the BEAM during a total 34 seconds. Time …

    Read Full Post

    NASA TV Coverage of Beam Expansion Continues

    NASA and Bigelow Aerospace are resuming operations to expand the Bigelow Expandable Activity Module (BEAM), currently attached to the International Space Station. NASA Television coverage is again underway and can be seen at https://www.nasa.gov/nasatv   During operations this morning, NASA Astronaut Jeff Williams introduced four pulses of air into the BEAM during a total 34 seconds. Time …

    Read Full Post

    BEAM Has Begun Expanding

    At 9:04 a.m. EDT, NASA Astronaut Jeff Williams began introducing air into the Bigelow Expandable Activity Module (BEAM) in a 22-second burst followed by an 8-second burst at 9:13 a.m. The teams are allowing the module to stabilize and expand in between bursts.  Flight controllers monitoring the operation have confirmed some expansion of the module …

    Read Full Post

    Bigelow Expandable Activity Module Expansion Underway

    BEAM Installation

    NASA and Bigelow Aerospace is making a second attempt this morning  to expand the Bigelow Expandable Activity Module (BEAM), currently attached to the International Space Station. NASA Television coverage is underway and can be seen at https://www.nasa.gov/nasatv  During initial operations Thursday to expand BEAM, the module’s length and diameter did not increase with the increased internal …

    Read Full Post

    Mobile Launch Umbilicals and Support Fact Sheet

    Cropped screen capture of fact sheet including title, first paragraph and graphic of launcher and rocket

    NASA’s Space Launch System (SLS) rocket will be assembled, processed and transported to the launch pad on a mobile launcher featuring a tower equipped with umbilicals connecting power, communications, fuel and other commodities to the vehicle. For more information on the Mobile Launcher umbilicals and support systems, download the fact sheet at: https://www.nasa.gov/sites/default/files/atoms/files/ml_umbilicals20160523.pdf

    Read Full Post

    BEAM Media Teleconference Rescheduled for 2 P.M. EDT

    Bigelow Expandable Activity Module

    NASA and Bigelow Aerospace have rescheduled their media teleconference for today from noon EDT to 2 p.m. to discuss the status of the Bigelow Expandable Activity Module (BEAM). Engineering teams monitored the module overnight for structural changes after attempts to fully expand the module yesterday were unsuccessful. They have been meeting throughout the morning to …

    Read Full Post

    ISS Daily Summary Report – 05/26/16

    Bigelow Expandable Aerospace Module (BEAM) Inflation: The crew began inflation operations this morning. During the course of two hours, the crew slowly pressurized BEAM using ISS cabin air, but BEAM only moved ~5 inches compared to the expected 72 inches in displacement and increased from 12 inches compared to the expected ~34 inches of increase …

    Read Full Post

    NASA and Bigelow Aerospace to Discuss BEAM Friday

    Canadarm2 Installs BEAM

    NASA and Bigelow Aerospace are continuing to evaluate why the Bigelow Expandable Activity Module (BEAM) did not fully expand today as planned and will not attempt to complete the module’s expansion on Friday. Engineering teams will monitor the module overnight for structural changes that could result in either larger volume or lower internal pressure before …

    Read Full Post

    Newly Installed VAB Platform H will Provide Access to SLS Booster Segments

    Workers inside the VAB prepare for installation of Platform H North inside High Bay 3

    The Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida reached a new level of preparation for the Space Launch System (SLS) rocket and Orion spacecraft. Platform H North was installed Tuesday in the iconic facility’s High Bay 3; its corresponding half, Platform H South, will be lowered into place today. Platform H will …

    Read Full Post