
S3/S4 Integrated Truss being moved into the Space Shuttle Payloa
In the Space Station Processing Facility, workers attach an overhead crane to the S3/S4 integrated truss in order to move it to the payload canister. After it is stowed in the canister, the S3/S4 truss will be transported to the launch pad. The truss is the payload on mission STS-117, targeted for launch on March 15.
Image Credit: NASA
- X
https://www.nasa.gov/image-detail/amf-ksc-07pd-0309/
TakenFebruary 7, 2007
ProducerKSC
Image CreditNASA
Size1920x1276px
PIA NumberKSC-07PD-0309