Bidders Library
For optimal compatibility, users are recommended to access documents using either the Google Chrome or Mozilla Firefox web browsers.
Industry Days Information
SIMO Contract Pre-Solicitation Conference Presentation
SIMO Contract Pre-Solicitation Conference Photo Tour Presentation
SIMO Industry Days Script
SIMO Industry Days Information for Bidders -Update 10/9/26
Industry Days Registration Form – ALL
One-on-One Meeting Registration (Prime Offerors only)
Historical Data and Information
Bidders Library File Index 9
Deferred Maintenance List
RY2025 Chemical List Table
Portfolios 1 & 2 BOSS Documents
Rev 4 KSC Vehicle Transit Permitting
Rev 3 Internal Biennial Inspection of the Bridges at KSC
Facility Change of Status Rev Basic
Rev 3 SHARP Team Instruction Final
Rev 5 Warranty Processing Final
Rev 3 Emergency Services Hurricane Ops Checklist
Rev 8 KSC Roadway Permit Application
Rev 1 Facilities, Systems, Equipment and Utilities Configuration Control Board Plan
Rev 16 Final Tropical Storm and Hurricane Preparation and Ride-Out
KSC Diverted Aggregate Reclamation and Collection Yard (DARCY) Operation Plan
KSC Landfill Training Plan Rev 5
KSC Landfill Operating Plan Rev 9
Rev 2 NASA Borrow Pit Operations & Maintenance Plan
Landfill and DARCY Compliance Program Rev 4
Rev 2 Industrial Wastewater Compliance Program
Rev 3 Potable Water and Domestic Wastewater Compliance Program
Rev 11 PVS Certification Compliance Procedure
Combined KSC Schwartz Rd Class III Landfill
Rev 3 Power Systems Mapboard Maintenance and Updates
Rev 18 CCC Switching Order and Work
Rev 8 CCC BFF Alarm Response Requirements
Rev 4 CCC Console Training
CCC Console Operator Responsibilities
80k 02217 Rev A Cancl (1)
Rev 3 Space Utilization Quality Review Instruction
Rev 3 Facility Door Room Numbering and Placard Instruction
Facility Space Management System Process Rev 3
Facility Numbering and Notice Release Process Rev 5
NASA RP Management System RPMS Trsctn Process Rev 5
Cycled Physical Inventory of Rpassets Rev 6
Rev 4 Site Plan Work Instructions
Rev 3 Guidelines for Editing the KSCGIS
Rev 14 Design Engineering Project Desk Guide
Rev 13 Technical Anomaly Event Disposition Process
Rev 4 FSEU Software Change Ctrl and Admin
Rev 11 IRA IRA-E and IDCR Procedure
Rev 9 BOSS Engineering Review Board Final 2
Rev 10 Requesting Technical Info
Maintenance Plan Standards
Rev 4 Systems Electronic Tie-in (SETI) log
Drawbridge Hurricane Plan
Banana River Bridge Operating Instructions
Rlg-1 Haulover Canal Bridge Operating Instructions
Rev Power Systems – Hurricane Plan
Ditch Retention Detention System Cleaning
Hurricane Operations for KSC HVAC Plants
SHARP Team Systems Agenda Checklist
Rev 17 SHARP Team Systems Breakdown
Rev 7 Long Range Planning Final
Rev 3 Industrial Control Systems Backup Procedure Signed Redacted
Portfolio 3 FPL MOU, EGS (GSDO) and KSC Documents
Hazardous Weather Rev-b-1 Org Sign Redacted
KDP-KSC-P-2190 Rev B-4 ncb-1
KDP-KSC-P-1319 Final Rev E 2
KDP-KSC-P-1311 Rev E-4 Final
KDP-KSC-P-1303 Rev Basic 2
KDP-KSC-P-1302 Excavation and Waiver Rev Basic
KDP-KSC-P-3006 Rev F Tropical Storm and Hurricane Operations
HPP-I-0005 KSC Heat Plant Daily Routine Duties
MOU FPL 0001 Power Switching Limitations at KSC CCAFS
KDP-KSC-P-3006 Rev F1 Tropical Storm and Hurricane Operations
KDP-KSC-P-3621 Basic 1 Fixed Hyperlinks
KDP-KSC-P-3253 Rev C1 Final
KDP-KSC-P-3018 Rev C National Incident Management System
KDP-KSC-P-3006 Ref F1 Tropical Storm and Hurricane Operations
Portfolio 4 KSC Policy Directives and Requirements Documents
KNPR-1860-2 Rev C1 Admin Final
KNPD 8830-2 Rev C Revalidation Released
KNPD-8500-1 rev D KSC Environmental Management Final 6
KNPD-6000-2 Rev C Commercial Transportation Corridors Released
Portfolio 5 KSC Plan Documents
KSC PLN 8750 Rev Basic Energy Conservation Performance Plan 10 Year
KSC PLN 8000-4 KSC Institutional Risk Management Plan
KSC PLN 5000 SIMS Rev C Clean V2
KSC PLN 2807 KSC Mishap Preparedness and Contingency Plan Rev B3
Portfolio 6 EGS (GSDO) and BOSS Documents
UTI-P 2008 Final 002 Chiller Plant, Utility Annex, LC-39
UTI-P 2001 Facilities Monitoring in the KSC Industrial Area Payload Processing Facilities
UTI-P 0010 Rev 6 KSC Cooling Tower Water Treatment Procedure
UTI-P 0008 Freeze Plan Task List HVAC Shop
WCC-P-2023 Rev 2 Electronic Work Request System Processing
WCC-P-2004 Moss Hurricane Prep and Recovery Procedures
WCC-F-2009 Work Management Hurricane Operations Checklist
UTI-P 2019 Utilities Water Fire Suppression Hurricane Plan Final 002
PPS-P-001 Rev 13 Protective Systems Impairment Notification Process
PPS-I-2012 Utilization of Protective Systems Daily Impairment Automation Software Application
PPS-I-0033 Rev 6 Use of ‘Out of Service’ Tags
PPS-F-2126 Rev 5 Freeze Plan Checklist
PPS-F-0006 Rev 10 Fire System ‘Final Test’ Construction Checklist
PPS-F-0005 Rev 8 Fire System Construction Checklist
UTI-P-0004 Rev 9 Water Treatment Plant Operations Plan
UTI-P-0003 BOSS Freeze Plan
UTI-I-0043 HVAC System Tel IV N6-2296 KSC
UTI-F-2008 Rev 2 Freeze Plan Task List HVAC Shop
UTI-F-2007 Rev 2 Freeze Plan Task List Water & Wastewater Shop
Qal-P-0008 Customer Satisfaction Rev 7
PPS-P 0030 C5 C5a Substation Operation
PPS-P-0020 Rev 8-2 Doc Alarm System Coordination Requirements
PPS-P 0004 Rev 17 Electrical Systems Power Switching Procedure
Portfolio 7 KSC Requirements and Other Documents
KNPR 8715-2 Rev B Revalidated Final
KNPR 8040-1 Rev C1 Admin Final
Portfolio 8 KSC and BOSS Documents
KSC-RPT-1201 AFL FIC Funding Sources
LSV-P-5118 Turn in Transfer, Sale of Excess Surplus Equipment, Material, Supplies
Log-P-5004 Rev 9 Preparation of the Spare Parts Analysis SPA Final
KTI-1303 Draft KSC Site Planning Instructions
KSC-UG-1903 Rev A Facilities Management Guidance for Mold Remediation
Portfolio 9 BOSS Documents
MSO-P 0001 Rev 4 Final Launch Planning and Coordination
MSO-I-0005 BOSS SpaceX General Support Agreement for Launch Complex 39A
MSO-I-0004 BOSS SpaceX Launch Contingency HVAC Support
MSI-I-0001 5-8 Scheduling Instruction Guide
PIO-F-PP01 Rev 1 Priority Analysis Tool
OMI-I 3715 Chiller Plant Industrial Area M7-407
MSO-P-0052 Hurricane Procedure
MSO-P-0010 JSDY Test Conductor Operations Rev 9
MSO-P-0004 Rev 12 BOSS Format
Portfolio 10 EGS (GSDO) and KSC Documents
KSC Portfolio 11 EGS (GSDO), BOSS and KSC Documents
KSC-PLN 1300 Integrated Outage Coordination and Management Plan
KSC-50-473 Project Specific Safety & Health Plan (PSHP)
KSC NASA Portfolio 12 NASA and KSC Documents
KDP-P-2713 Rev F Final NCB3
KNPR 8730-2 Rev D with Effective Date 2025-03-18
NASA Portfolio 1 NASA IT Related Documents
ITS HBK 2810-09-04A Incident Response and Management Guidelines for Data Spillage and Sanitization Procedures
ITS HBK 2810-09-03B Collection of Electronic Data
ITS HBK1382-06-01 Web Privacy Notices and Redress
ITS HBK 1382-05-01 Privacy Incident Response and Management Breach Response Team Checklist
ITS HBK 2810-11-2C Media Protection and Sanitization
ACA KPLSS-II BOSS Logistics OA 02 Rev 1 LP
ACA KPLSS-II BOSS GN2 and GHe System OA 01 Updated
ACA KLSX-III BOSS 7-10-2020 Fully Executed
BOSS NEMCON Operational Agreement Final LP Signed
BOSS LASSO II Operational Agreement Final Rev 1
Amentum NG Associate Contractor Agreement 230507 Rev 1
Amentum Associate Contractor Agreement ROAR JV 12-22-2023
ACA LASSO II BOSS 8-17-2023
ACA KLSX III BOSS 7-10-2020 Fully Executed
LASF IOZ LV Electrical Orion Fac 17 OA Final
CSG Signed ACA NEMCON BOSS Final
COMET ACA I-0001 Jacobs COMET Amentum Spaceport LLC BOSS Rev 1
BOSS NICS (KSC) ACA Signed
OA BOSS TOSC 03 Pad B Structural Civil Systems Rev 1
OA BOSS TOSC 02 KICS Reporting
OA BOSS TOSC 01 Dup Trailers Fully Executed
Last IOZ Fire Protection Orion KSC Fac 16 OA Final
LASF Operational Agreement LP Signed 11
OA BOSS TOSC 07 Joint Use Tensile Tester Equipment Fully Executed
OA BOSS Tosc 06 Science Annex Facility
OA BOSS TOSC 05 VAB Structural Civil Systems
OA BOSS TOSC 04 Receiving and Delivery Interfaces
Cooperational Agreement LP Signed
OC IOZ LV Electrical Orion KSC Fac 13 OA Final
OC IOZ Fluids Orion KSC Fac 14 OA Final
Control Systems Inventory
BOSS Security Control Requirements Continuous Monitoring Frequencies
BOSS Disposal Cases FY23 & FY24
2024 Natural Gas Meters WLIs
2023 EPCRA Tri Threshold Determination Data Template
Historical Reps TCS SRS 1
EGS Launch Operations WADs
PWS 3-2-12-2 Traffic Control Devices Attach 2 FY23 Traffic Signal PM Repairs WONs
PWS 3-2-12-2 Traffic Control Devices
US-EPA Tri Chemical List Changes
Re-Retro Commissioning Covered Facilities With Space Types
PWS 3-2-12-2 Traffic Control Devices Attach 5 FY23 Helipad PM Repair WONs
PWS 3-2-12-2 Traffic Control Devices Attach 4 FY 23 Pavement Markings and Turf Shoulder Inspection Results