Suggested Searches

EC02-0188-19

Technician Dave Brown installs a drilling template during construction of the all-composite left wing of NASA's Altair aircraft at General Atomics Aeronautical Systems, Inc., (GA-ASI) facility at Adelanto, Calif.

Image Credit: NASA/Tom Tschida
Download