Suggested Searches

1 min read

X-43A Monitor Station Operator Brad Neal Performs Final Checks and Pre-Flight Preparations

X-43A Monitor Station Operator Brad Neal Performs Final Checks and Pre-Flight Preparations
NASA X-43A Monitor Station Operator Brad Neal performs final checks and pre-flight preparations aboard the B-52 for the third X-43A research vehicle Mach 10 flight on November 16, 2004.

ED04-0320-13
NASA X-43A Monitor Station Operator Brad Neal performs final checks and pre-flight preparations aboard the B-52 for the third X-43A research vehicle Mach 10 flight on November 16, 2004. Takeoff of the B-52B mothership carrying the X-43A took place at 1 p.m., PST, with launch of the booster rocket/X-43A approximately an hour later.November 16, 2004NASA Photo / Tom Tschida› X-43A Project Description