ISS Daily Summary Report – 5/08/2023
Crew-6 Port Relocation: On Saturday, May 6th, Crew Dragon Endeavor was successfully relocated from Node 2 Zenith to Node 2 Forward. This relocation was completed in preparation for the arrival of SpX-28 in early June, which requires the Node 2 Zenith port for robotic arm access. The crew will be off duty today to recover from this event.
Payloads: Crew Off Duty
Systems: Crew Off Duty
Completed Task List Activities:
- N/A
Today’s Ground Activities:
All activities are complete unless otherwise noted.
- Potable System Configuration for EDV Fills
- RS MPEG2 Video Support
- PRO CIR Activation Commanding
- Video Distribution System Survey of 69S
Look Ahead Plan
Tuesday, May 9 (GMT 129)
Payloads:
- Food Consolidate
- HRF Rack Handle Replace and HRF Resupply
- Hunch Ball Clamp Monopod Ops (Cupola, Lab, MSG) and Eval
- NRCSD-25 Removal
Systems:
- IFM CDRA BLW R&R
- EVA Helmet Clean
- ECLSS Recycle Tank Drain & Fill
- EVA Battery Operations Terminal File Transfer Initiate
- Cargo Dragon SSC Return
Wednesday, May 10 (GMT 130)
Payloads:
- Food Consolidate
Systems:
- EMU Half Water Tank Dump and Fill
- EMU Cooling Loop Scrub
- EMU HUT Scrubber Install
- IFM N1Z Hatch Troubleshooting
- IFM Ku-band Power Supply Install
- Node 3 COTS Air Sensors Install
- IFM WHC COT R&R
- HMS OCT2 Exam
Thursday, May 11 (GMT 131)
Payloads:
- Actiwatch HRF1 Setup and Swap
- APM Lab Removal and Node 3 Install
- AstroPi Lens Cap Install
- BioNutrient-2 Survey
- Food Consolidate
- Food Physiology Diet Brief
- Immunity Assay Sample Collect and Processing
- JWRS Sample Collect
- Ring Shear Drop Hardware Gather and Sample Insert
- Space Health Session (48hr)
Systems:
- EHS Acoustic Monitor Modified Noise Survey
- IFM Node 3 TCCS Charcoal Bed Gather
- CEVIS Portable PFS
- ARED Kraken Install
- RS EVA Tether Inspection
Today’s Planned Activities:
All activities are complete unless otherwise noted.
- N/A