ISS Daily Summary Report – 12/21/2022

USOS 4A ISS Roll Out Solar Array (IROSA) Install Extravehicular Activity (EVA) Replan: Today’s EVA was cancelled and will be rescheduled for tomorrow December 22nd. This morning, as the crew and ground teams prepared for today’s EVA, updated tracking data on space debris showed a close approach to station. Based on the data and per Flight Rules, the flight control team aborted the EVA and executed a Pre-Determined Debris Avoidance Maneuver (PDAM). The maneuver used the Roscosmos Progress 81 thrusters to provide an extra measure of distance away from the predicted track of the debris. Thruster firing occurred at 7:42 AM CST. The burn duration was 10 minutes and 21 seconds with a Delta-V of 1.0 m/s. The ISS is now in a nominal configuration.

Payloads:

Plant Habitat: The crew gathered four carbon dioxide bottles, removed the vent valves, and prepared them for return on SpX-26. Plant Habitat will be used to support the Plant Habitat-03 experiment in the near future. Plants exposed to environmental stress, including spaceflight, undergo epigenetic changes that involve adding extra information to deoxyribonucleic acid (DNA) rather than changing existing information. Epigenetic Adaptation to the Spaceflight Environment – Accumulated Genomic Change Induced by Generations in Space (Plant Habitat-03) assesses whether epigenetic adaptations in one generation of plants grown in space can transfer to the next generation. This investigation could help identify genetic elements that increase the adaptability of plants to spaceflight, a first step toward developing cultivars better suited to provide food, air, and water purification in life support systems on future space missions.

Systems:

Cargo Operations: The crew continued cargo transfer operations between the ISS and both SpX-26 Dragon Cargo Vehicle and the Cygnus NG-18 cargo vehicle. SpX-26 is scheduled to remain at the ISS until early January before it departs the ISS to bring back science payloads and other cargo to Earth while NG-18 is scheduled to remain at the ISS until the end of January before it departs the ISS for an eventual destructive re-entry in the Earth’s atmosphere.

Completed Task List Activities:

  • WHC-KTO-REPLACE (GMT 354)

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • EVA ISLE Prep Operations
  • PDAM

Look Ahead Plan

Thursday, December 22 (GMT 356)
Payloads:

  • No Payload Activities

Systems:

  • 4A IROSA Install EVA

Friday, December 23 (GMT 357)
Payloads:

  • Airborne Particulate Monitor
  • CardioBreath Calibration and CEVIS Run
  • ELF Sample Holder Installation
  • HRF Veggie POMS Questionnaire
  • JAXA MCU and As-LiB Installation to EFU-2
  • MELFI 3 Icebrick Insert
  • MSPR Video Cable Config
  • PFMI-ASCENT Sample Exchange
  • Repository Urine and Blood Collect
  • Smart One Hardware Removal
  • Sphere Camera-1 WORF Recording
  • Standard Measures
  • Toilet IFM

Systems:

  • EVA Debrief Conference
  • EVA EMU Water Recharge
  • EVA A/L Deconfiguration

Saturday, December 24 (GMT 358)
Payloads:

  • MELFI Icebrick Insert 5
  • Veg-05 Plant Check and Thinning

Systems:

  • UTS Offload EDV Swap
  • Regenerative ECLSS Tank Drain and Fill

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Crew performed unplanned task list activities due to unexpected cancellation of the EVA