Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from August 2021

View All Posts

    ISS Daily Summary Report – 8/02/2021

    Payloads Combustion Integrated Rack/Advanced Combustion via Microgravity Experiments (CIR/ACME): The crew exchanged a used 85% O2/ 15% N2 bottle with a new one of the same composition; however, during the installation, a loose pressure relief valve body was found.  The ground is discussing steps to re-tighten the valve body and proceed with operations.  This will …

    Read Full Post