ISS Daily Summary Report – 4/21/2020
Fluids Integration Rack (FIR): The crew replaced both FCF Hard Drives in the FCF Image Processor in the FIR. This change out is in response to the hard drive failure that occurred on GMT 063 and will allow the continuation of ACE-T4 experiment operations. The FIR is a complementary fluid physics research facility designed to host investigations in areas such as colloids, gels, bubbles, wetting and capillary action, and phase changes, including boiling and condensation.
Japanese Small Satellite Orbital Deployer (J-SSOD) #13: The crew performed Part 1 of the J-SSOD #13 installation procedures. This involved installing the J-SSOD deployer hardware onto the Multi-Purpose Experiment Platform (MPEP). The JEM Small Satellite Orbital Deployer (J-SSOD) provides a novel, safe, and small satellite launching capability to the International Space Station (ISS). The J-SSOD is a unique satellite launcher, handled by the Japanese Experiment Module Remote Manipulator System (JEMRMS), which provides containment and deployment mechanisms for several individual small satellites. Once J-SSOD, including satellite install cases with small satellites, is installed on the Multi-Purpose Experiment Platform (MPEP) by crew members, it is passed through the JEM airlock for retrieval, positioning, and deployment by the JEMRMS.
Systems
Emergency Roles and Responsibilities Review: All three crew participated in the review of the EMER-2 Emergency general instructions and discussed overall emergency responses. The crew reviewed procedures for an initial response to a depress event, to pinpoint a leak on the vehicle and how to isolate in the event of a known leak in the Russian segment.
Exercise Video Sessions: Today the crew setup up video cameras to record and downlink their exercise sessions on the Treadmill 2 (T2) and Advanced Resistive Exercise Device (ARED). These video sessions allow the ground to perform biomechanical evaluations of the on-orbit crewmembers and obtain a hardware status.
Completed Task List Activities:
- Gather Vestibule Outfitting Kit (VOK)
Today’s Ground Activities:
All activities are complete unless otherwise noted.
- INT MDM Transition
- Daily File Downlinks
- ECLSS Pre/Post configuration commanding for INT-2 Transition
- INT MDM Swap Rack Power Switch Reconfiguration
Look Ahead Plan
Wednesday, 4/22 (GMT 113)
Payloads:
- Russian blood samples into MELFI (ESA)
- SSOD-13- Flag photo (JAXA)
- JEM Small Satellite Orbital Deployer(SSOD-13) part 2&3 install (JAXA)
- ELC4 Solid State Drive (SSD) removal (NASA)
- VEGGIE PONDS Growout 1 &2 Harvest (NASA)
Systems:
- Pack and Stow Cygnus Trash
- Total Organic Carbon Analyzer (TOCA) Water Recovery System (WRS) Sample Analysis
Thursday, 4/23 (GMT 114)
Payloads:
- Food Physiology Brief (NASA)
- CIR-FOMA-Calibration unit replace (NASA)
- ACTIWATCH-swap and data downlink (NASA)
- MSL GEDS SCA sample Cartridge swap (NASA)
Systems:
- Periodic Health Status (PHS) Evaluation
- Urine Processing Assembly (UPA) Brine Filter Gather
Friday, 4/24 (GMT 115)
Payloads:
- CIR-FOMA-Calibration unit prep (NASA)
- GEDI Photo (NASA)
- JEM Airlock depress (NASA)
Systems:
- MAX CEVIS Session
- Regenerative Environmental Control and Life Support System (ECLSS) Urine Processor Assembly (UPA) Brine Filter Changeout
- Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain & Fill
- HAM Radio Powerdown
- USOS Shutter Close
Today’s Planned Activities:
All activities are complete unless otherwise noted.
- KORREKTSIYA. Accelerometry
- Photo T/V (P/TV) Advanced Resistive Exercise Device (ARED) Exercise Video Setup
- Voice check in S/G1 from Baikonur
- JEM Small Satellite Orbital Deployer (SSOD) VIDEO REVIEW
- KORREKTSIYA. Log Entry of Liquids and Food (Medicine) Intake
- JEM Airlock Slide Table (ST) Extension/Retraction to JPM Side
- MPEP and Passive Capture Mechanism Installation to JEM Airlock Slide Table
- Preventive Maintenance of FS1 Laptop
- Routine Monthly Maintenance of BRI
- ALGOMETRIYA. Experiment Session
- Weekly check of video recording equipment performance on the ISS RS
- JEM Small Satellite Orbital Deployer (SSOD) onto Multi-Purpose Experiment Platform (MPEP) Installation Part 1
- Photo/TV. Camcorder setup verification
- Health Maintenance System (HMS) ISS Food Intake Tracker (ISS FIT)
- Food Acceptability Survey
- WHC Hardware Gather for Transfer to RS
- Waste and Hygiene Compartment (WHC). Hardware transfer
- Emergency Roles and Responsibilities Review
- Filling (separation) of ЕДВ-СВ or ЕДВ (КОВ) for Elektron-VM
- Crew time for ISS orientation
- FIR Image Processor Hard Drive Replace
- Preventive Maintenance of SM Ventilation Subsystem. Group А
- Fluids Integrated Rack – Rack Doors Close/Open
- CB/ISS CREW CONFERENCE
- KORREKTSIYA. Experiment setup
- Hardware pre-pack for disposal via Cygnus NG-13
- Treadmill 2 (T2) Exercise Video Equipment Setup/Stow
- Video Recording of Greetings