Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from June 2017

View All Posts

    ISS Daily Summary Report – 6/16/2017

    67 Progress (67P) Docking: 67P rendezvous and docking to ISS Service Module (SM) aft port was completed successfully today at 6:37 am CDT.  Following hatch opening the crew began transferring early unstow items. Japanese Small Satellite Orbital Deployer (J-SSOD): The crew brought the JEM Airlock Slide Table (ST) into the ISS and mounted the J-SSOD …

    Read Full Post

    ISS Daily Summary Report – 6/15/2017

    Neutron Star Interior Composition ExploreR (NICER) Status: Yesterday’s planned NICER deployment was not completed due to  a problem with releasing all four of the NICER launch locks. Following several attempts, the NICER team successfully released three of the four launch locks. The team continues attempts to release the fourth lock.  NanoRacks Module-52:  The crew performed …

    Read Full Post

    ISS Daily Summary Report – 6/14/2017

    67 Progress Launch: 67P launched successfully from Baikonur, Kazakhstan today at 4:20am CDT followed by a nominal ascent and orbit insertion.  All systems are performing nominally.  Docking is scheduled for Friday, June 16 at 6:42am CDT.  Rodent Research-5 (RR-5) Systemic Therapy of NELL-1 for Osteoporosis: The crew restocked two of the four Animal Habitats and …

    Read Full Post

    ISS Daily Summary Report – 6/13/2017

    Electrostatic Levitation Furnace (ELF): The crew replaced the Sample Cartridge and the stuck Sample Holder in the ELF with a new type of Sample Holder and a Sample Cartridge.  The ELF is an experimental facility designed to levitate, melt and solidify materials by containerless processing techniques using the Electrostatic Levitation method. With this facility, thermophysical …

    Read Full Post

    ISS Daily Summary Report – 6/12/2017

    Rodent Research-5 (RR-5) Systemic Therapy of NELL-1 for Osteoporosis:  On Saturday two crewmembers performed the second injection of the RR-5 mice in the Microgravity Science Glovebox (MSG).  Spaceflight has significant and rapid effects on the musculoskeletal system; therefore, it is important to investigate targeted therapies that could ameliorate some of the detrimental effects of spaceflight. …

    Read Full Post

    ISS Daily Summary Report – 6/09/2017

    Rodent Research-5 (RR-5) Systemic Therapy of NELL-1 for Osteoporosis:  Two crewmembers performed the first injection of the RR-5 mice in the Microgravity Science Glovebox (MSG).  Spaceflight has significant and rapid effects on the musculoskeletal system, therefore, it is important to investigate targeted therapies that could ameliorate some of the detrimental effects of spaceflight. The NELL-1 …

    Read Full Post

    ISS Daily Summary Report – 6/08/2017

    NanoRacks Module-70:  The crew removed NanoRacks Module-70 from the Nanoracks Platform-2 in the Japanese Experiment Module (JEM) and inserted it into a General Laboratory Active Cryogenic ISS Experiment Refrigerator (GLACIER).  Module-70 is an educational research project designed to study the effects of radiation damage to synthetic DNA for gene regions that code for a human …

    Read Full Post

    ISS Daily Summary Report – 6/07/2017

    NanoRacks Module-70:  The crew removed NanoRacks Module-70 from a General Laboratory Active Cryogenic ISS Experiment Refrigerator (GLACIER) this morning and installed it into the Nanoracks Platform-2 in the Japanese Experiment Module (JEM).  Module-70 is an educational research project designed to study the effects of radiation damage to synthetic DNA for gene regions that code for …

    Read Full Post

    ISS Daily Summary Report – 6/06/2017

    SpaceX (SpX)-11 Ingress and Unpack: Following yesterday’s successful capture, berthing, and ingress of SpX-11, today the crew began transferring payloads and cargo to the ISS. This multi-day process will result in the transfer of 3,900 pounds of science and cargo and the beginning of Fruit Fly Lab and Rodent Research later this week.  Fruit Fly …

    Read Full Post

    ISS Daily Summary Report – 6/05/2017

    SpaceX (SpX)-11 Launch and Berth: SpX-11 launched on Saturday, June 3 at 4:07pm CDT. Capture occurred today at 9:00am CDT followed by berthing at ~11:30m CDT. The crew completed successful pressurization and leak checks, removed Control Panel Assemblies and configured the Dragon vestibule for ingress which is scheduled tomorrow. Robotics ground controllers will translate the …

    Read Full Post