Mobile Servicing System (MSS) Operations: When trying to power up the Special Purpose Dexterous Manipulator (SPDM) Control Unit 2 (SACU2) the sequence aborted with the same signature as yesterday. When swapping Bus channels, the power up sequence completed. It was decided to call off the RapidScat activity and perform troubleshooting instead to better understand the …
ISS Daily Summary Report – 12/14/2016
Mobile Servicing System (MSS) Operations: Last night, the Robotics Ground Controllers powered up the MSS and maneuvered the Space Station Remote Manipulator System (SSRMS) to extract the External Platform (EP) from the HTV-6 Unpressurized Logistics Carrier (ULC) and install it on the Payload and ORU Accommodation (POA). Initially the SSRMS would not mode to Operational …
ISS Daily Summary Report – 12/13/2016
HII Transfer Vehicle (HTV)-6 Capture/Berthing: This morning, the crew captured HTV-6 at 4:37 am CST using the Space Station Remote Manipulator System (SSRMS). Following capture, Robotics Ground Controllers used the SSRMS to maneuver the HTV-6 into position to support the inspection of the HTV-6 Passive Common Berthing Mechanism (CBM) and maneuver the HTV-6 to the …
ISS Daily Summary Report – 12/12/2016
Human Research Collections: The crew performed collections for several Human Research experiments today. Samples were collected and stowed in Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI). Samples were collected for Biochemical Profile, Repository, and Multiomics. The Biochemical Profile experiment tests blood and urine samples obtained from astronauts before, during, and after spaceflight. Specific …
ISS Daily Summary Report – 12/09/2016
HII Transfer Vehicle (HTV)6 Launch: HTV6 launched from Tanegashima Space Center, Japan at 7:26 am CST today. Capture is scheduled for next Tuesday, December 13 at 5:00 am CST. Group Combustion: The crew performed additional troubleshooting on JAXA’s Multi-Purpose Small Payload Rack (MSPR) contained Group Combustion experiment. After removing the Combustion Chamber and installing it …
ISS Daily Summary Report – 12/08/2016
Everywear: Today a crewmember configured the Smartshirt for exercise and then donned it for an exercise session with the Cycle Ergometer with Vibration Isolation and Stabilization (CEVIS) while data was recorded by the iPad Everywear application. Everywear is an ambulatory data collection system that makes use of wearable sensors connected to an iPad tablet computer …
ISS Daily Summary Report – 12/07/2016
Story Time From Space Demo: The crew recorded a narrated video that pairs with the books Max Goes to Mars and Max Goes to Jupiter, that demonstrates how in the absence of compressive forces exerted by the earth’s gravity, the human body grows/stretches. Story Time From Space combines science literacy outreach with simple demonstrations recorded …
ISS Daily Summary Report – 12/06/2016
Space Station Remote Manipulator System (SSRMS) Operations: Monday afternoon and overnight, Robotics Ground Controllers powered up the Mobile Serving System (MSS) and configured the SSRMS and Special Purpose Dexterous Manipulator (SPDM) Arm2 for translation. They then translated the Mobile Transporter (MT) translation from Worksite(WS)7 to WS5, stowed the SPDM on the Lab, and walked the …
ISS Daily Summary Report – 12/05/2016
Human Research Program (HRP) collections and operations: Over the weekend, the crew continued sample collections for Biochem Profile, Repository, and Cardio Ox investigations. This morning the Cardio Ox subject donned an Electrocardiogram (ECG) and with operator assistance performed ultrasound scans of the Brachial and Carotid arteries. The Biochem Profile experiment tests blood and urine samples …
ISS Daily Summary Report – 12/02/2016
Robotic External Leak Locator (RELL) Operations: Overnight, RELL checkout and demonstration was performed by performing scans of the Port 1 Truss (P1) Truss Radiator Beam Valve Modules (RBVMs), and the P1 Ammonia (NH3) Vent. Today the Robotics Ground Controllers are performing the Pump Flow and Control Subsystem (PFCS) survey. Once the PFCS survey is complete, …


