Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from November 2016

View All Posts

    ISS Daily Summary Report – 11/02/2016

    Group Combustion Leak Check: CDR retrieved the Combustion Chamber from the Multi-Purpose Small Payload Rack (MSPR) Work Volume and installed a top plate on the Combustion Chamber.  The crew then installed a gas bottles and air supply lines to configure for a leak check.  Ground specialists are focusing the leak check on the Group Combustion …

    Read Full Post

    ISS Daily Summary Report – 11/01/2016

    Extravehicular Mobility Unit (EMU) Maintenance:  The crew performed a half water dump and fill on EMU 3006 feedwater tanks and a full water dump and refill of EMUs 3003 and 3010 feeedwater tanks. These activities satisfy maintenance requirements for on-orbit stowage of the EMUs.  Urine Processing Assembly (UPA):  Last week, the crew demated the connection …

    Read Full Post