Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

ISS Daily Summary Report – 06/15/15

Japanese Experiment Module Airlock (JEMAL) Operations: Kelly opened the outer hatch and extended the JEMAL Slide Table (ST) to the JEM Exposed Facility (JEF). Ground controllers then maneuvered the JEM Remote Manipulator System (JEMRMS) with the Free-Space Passive Dosimeter for Life-Science Experiment in Space (Free-Space PADLES) to the ST and docked them followed by retraction of the ST back into the JEMAL. On Wednesday, the Free-Space PADLES will be removed from the table for return. Free-Space PADLES is an investigation that uses a Sealed Free-Space Dosimeter to measure radiation doses outside the International Space Station (ISS). The obtained results are used for verification of the ISS hull wall shielding contribution, and a benchmark study to develop existing simulation codes and space radiation models for present, and future, human space flight activities.

SUPVIS-E: Kelly installed the SUPVIS-E software on an ISS laptop in advance of the European Space Agency (ESA) short duration mission crewmember’s arrival on 44 Soyuz. SUPVIS-E aims at simulating selected future Human exploration scenarios including immersive remote control of a robot by an astronaut in orbit around a target object (such as Mars or the Moon). A crew member will control the ESA test rover located at ESOC (Germany) in near real time.

On Board Training (OBT) Robotics On-Board Trainer (RoBOT): In preparation for the arrival of SpaceX (SpX)-7, Padalka and Kelly completed a session of this training. With assistance from ground teams, they covered the Dragon mission profile, rendezvous crew procedures and crew interfaces for monitoring and commanding drag. Following the OBT the crew and ground teams discussed results.

Waste and Hygiene Compartment (WHC) Urine Receptacle (UR) Routine Maintenance: Kelly Removed & Replaced (R&R) the WHC UR and insert filter. Following replacement, a functionality test of the WHC was successfully performed.

Mobile Servicing System (MSS) Operations: Robotics ground controllers surveyed the International Docking Adapter (IDA) cables on Pressurized Mating Adapter (PMA)-2 in preparation for the future IDA install Extravehicular Activity (EVA). The ground team is current relocating the Special Purpose Dexterous Manipulator (SPDM) from Mobile Base System (MBS) Power Data Grapple Fixture (PDGF) 2 to the Lab PDGF in preparation for SpX-7 capture.

Today’s Planned Activities
All activities were completed unless otherwise noted.

  • Filling (separation) of EDV (KOV) for Elektron or EDV-SV (Separate EDV-SV No.1142)
  • RLT – Laptop Activation
  • Fine Motor Skills – Experiment Ops
  • JEMAL – Opening Outer Hatch and extending slide table to JEF side
  • Fine Motor Skills – Experiment Ops
  • Vacuum Cleaning SM ПФ1-4 Dust Filter Cartridge / r/g 8393
  • Working with two new laptops with two new sets of cables
  • JEMAL – Closing SAM
  • DAN. Experiment Ops. / r/g 9083
  • DAN. Experiment Execution Support / r/g 9083
  • JEMAL – Retracting Slide Table and closing Outer Hatch
  • JEMRMS – Laptop Deactivation
  • Exercise data downlink / r/g 6797
  • Medical Kit Audit / r/g 9076
  • METERON – Laptop Installation and Activation
  • VIRU. Software Update. / r/g 9086
  • OBT – Dragon Rendezvous and Docking Conference
  • VIRU. Hardware Setup for Relaksatsiya Experiment. / r/g 9087
  • OBT – Dragon Rendezvous and Berthing Procedures Review
  • METERON – Laptop Activation and Configuration
  • OBT – Dragon Rendezvous and Berthing Procedures Review
  • OBT – Dragon Robotics Review / See OSTPV for Procedure
  • OBT – Dragon Robotics Review
  • VIRU. Hardware parameter adjustment for Relaksatsiya Experiment. / r/g 9087
  • IMS Delta File Prep
  • Waste and Hygiene Compartment (WHS) Urine Receptacle and Insert Filter Changeout
  • VIRU. Earch Observation Relaksatsiya Experiment / r/g 9087
  • VIRU. Closeout Ops and Hardware Teardown after Relaksatsiya Experiment. / r/g 9087
  • VIRU. Fill out and Downlink of VIRU Log Sheet / r/g 9087
  • Transfer of recorded files from БПИ НЧ to RSS1 Laptop and Downlink via OCA / r/g 9084

Completed Task List Items

  • LHA R&R
  • PAO downlink message (New Horizons)
  • PAO downlink message (Comic-Con Convention)

Ground Activities
All activities were completed unless otherwise noted.

  • BCDU 1A1 Reconditioning [In Work]
  • MSS survey
  • MSS SPDM unstow [In Work]

Three-Day Look Ahead:

  • Tuesday, 06/16: OBT RoBOT training for SpX-7, ACE H-1 sample changeout, BCAT intervelometer change, Ocular Health
  • Wednesday, 06/17: JEMAL pressurization, MPEP dosimeter removal, Rodent Research (RR) MSG stow, Ocular Health
  • Thursday, 06/18: RR Microgravity Science Glovebox LSAH cleanup, Ocular Health

QUICK ISS Status – Environmental Control Group:

Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

On

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

Off

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Shutdown

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Standby

Urine Processing Assembly (UPA)

Process

Trace Contaminant Control System (TCCS) Lab

Off

Trace Contaminant Control System (TCCS) Node 3

Full Up