Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from May 2015

View All Posts

    ISS Daily Summary Report – 05/15/15

    Fluid Physics Experiment Facility (FPEF) Marangoni Deformation (MD) Removal: Cristoforetti removed the MD10 from the FPEF in preparation for Dynamic Surf-3 scheduled in Increment 45.  Fluid convection observations are performed of a silicone oil liquid bridge that is generated by heating the one disc higher than the other within the FPEF. By observing and understanding …

    Read Full Post

    ISS Daily Summary Report – 05/14/15

    ExHAM Installation: Kelly installed the Handhold Experiment Platform on the JEM Airlock (JEMAL) Slide Table and the Platform Adapter and Exposed Area Dosimeter and covered them with Multi-Layered Insulation (MLI).  He then installed the Handhold Experiment Platform and attached the samples for the various external experiments including the Free Space Dosimeter and ExHAM.  The JEMAL …

    Read Full Post

    ISS Daily Summary Report – 05/13/15

    Combustion Integration Rack (CIR) Multi-user Droplet Combustion Apparatus (MDCA) Replace: In preparation for the start of FLame Extinguishment Experiment (FLEX)-2J, Virts removed the MDCA Chamber Insert Assembly (CIA) from the CIR Combustion Chamber and replaced the MDCA Needles, fuel reservoirs, MDCA Igniter Tips and the MDCA Fiber Arm. Following the changeouts, he reinstalled the MDCA …

    Read Full Post

    ISS Daily Summary Report – 05/12/15

    Rodent Research-2 Center for the Advancement of Science in Space (RR-2 CASIS): Kelly performed a fixative flush and swapped the samples collected yesterday which he inserted into MELFI.  The primary objective of this research is to monitor the effects of the space environment on the musculoskeletal and neurological systems of mice as model organisms of …

    Read Full Post

    ISS Daily Summary Report – 05/11/15

    Rodent Research-2 Center for the Advancement of Science in Space (RR-2 CASIS): Kelly and Virts successfully performed the third set of four sample collections, including use of the recently recovered Bone Densitometer.  Kelly was the primary operator while Virts assisted, placing samples in containment then in Minus Eighty-Degree Laboratory Freezer in ISS (MELFI).  The crew …

    Read Full Post

    ISS Daily Summary Report – 05/08/15

    Crew Half-Duty Day: Today was a half duty day for the USOS crew following a week of CDRA operations and activities associated with SpX-6 unberthing, currently scheduled for May 21. Gene, Immune and Cellular Responses to Single and Combined Space Flight Conditions – A (Triplelux-A):  Cristoforetti closed out the Triplelux-A experiment today. She unstowed and …

    Read Full Post

    ISS Daily Summary Report – 05/07/15

    Bone Densitometer (BD) Imaging On-orbit Replacement Unit (ORU) Remove and Replace (R&R): Following a failed checkout of the BD, ground controllers determined that the Imaging Unit had failed. Cristoforetti R&R’ed the unit today in advance of Rodent Research sample collections next Monday. Ground controllers successfully calibrated the unit and are ready to proceed with Rodent Research …

    Read Full Post

    ISS Daily Summary Report – 05/06/15

    Gene, Immune and Cellular Responses to Single and Combined Space Flight Conditions – A (Triplelux-A): Cristoforetti installed the three Triplelux Reservoir A into the Automatic Ambient Stowage (AAS) inserts. She retrieved the second Culture Tube A from Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI), thawed it in the Biolab glovebox and installed it in …

    Read Full Post

    ISS Daily Summary Report – 05/05/15

    Gene, Immune and Cellular Responses to Single and Combined Space Flight Conditions – A (Triplelux-A): Cristoforetti continued operations for run two of two of Triplelux-A. She installed the Experiment Container (EC) in the Biolab Left Rotor (Rotor L) and activated the run. Triplelux-A uses a rat macrophage cell line to investigate and compare the ability …

    Read Full Post

    ISS Daily Summary Report – 05/04/15

    Robotics Refueling Mission (RRM) Operations: Over the weekend, the Special Purpose Dexterous Manipulator (SPDM) picked up Task Board 2 (TB2) and the Safety Cap Tool (SCT) from the RRM. The Mobile Transport (MT) was translated to Work Site (WS) 7 where the SPDM stowed TB2 and the Safety Cap Tool on the RRM On-orbit Transfer Cage …

    Read Full Post